odor control update
play

Odor Control Update Crozet Interceptor System and Moores Creek - PowerPoint PPT Presentation

Odor Control Update Crozet Interceptor System and Moores Creek AWRRF Board of Directors Meeting July 25, 2017 Richard Gullick, Director of Operations Timothy Castillo, Wastewater Manager Overview Crozet Interceptor change in


  1. Odor Control Update Crozet Interceptor System and Moores Creek AWRRF Board of Directors Meeting July 25, 2017 Richard Gullick, Director of Operations Timothy Castillo, Wastewater Manager

  2. Overview  Crozet Interceptor – change in treatment  MCAWRRF Short-Term Solution  MCAWRRF Long-Term Solutions

  3. Crozet Interceptor Odor Control Pump Station #1 Pump Station #2

  4. Results Summary Comparison of Hydrogen Sulfide at Crozet Interceptor Pump Stations June '16 June '17 June '16 June '17 Average H 2 S Average H 2 S Maximum H 2 S Maximum H 2 S (ppm) (ppm) (ppm) (ppm) Location VENDOR A VENDOR B % reduction VENDOR A VENDOR B % reduction Pump Station #3 4 0.1 98% 149 11 93% Pump Station #2 1 0.1 90% 50 8 84% Pump Station #1 2 0.1 95% 93 10 89% Manhole #31 2 0.4 80% 153 63 59%

  5. H 2 S at Crozet Interceptor Pump Station #3 V E N D O R A V E N D O R B

  6. MCAWRRF Short-term Odor Control Ferric Chloride Tanks and Feed Pump Chemical Feed Point at Headworks

  7. Results Summary Hydrogen Sulfide Concentrations at MCAWRRF Primary Clarifier Launders June/July 2014 June/July 2017 H 2 S (ppm) (without FeCl 3 ) (with FeCl 3 ) % reduction Avg. 21 2 90% Median 20 1 95% Max 85 29 66% Min 13 0 100%

  8. H 2 S at MCAWRRF Primary Clarifiers

  9. Effect Number of citizen odor complaints: March 2016 March 2017 thru June 2016 thru June 2017 % reduction Crozet Interceptor 13 0 100% Moores Creek AWRRF 12 0 100%

  10. Long-Term Odor Control Equalization Basin Bypass Piping Foul Air Bio-Scrubber

Recommend


More recommend