NRO Open-use Tomofumi Umemoto (NRO)
Call for Proposals • 2750 hrs for open-use including VLBI • H22, H40, Z45, T70 and FOREST open • Spectral Window Mode opens only for FOREST • Dump Ume for OTF mode is allowed to be not only 0.1s but 0.04s • Not open for Joint with ASTE telescope • Remote observaUon from limited UniversiUes in Japan, Mitaka, ASIAA/Taiwan, and KASI/Korea is allowed • Simultaneous observaUon of H22/H40 is offered from semester 2018B December 27, 2018 ALMA/NRO/ASTE Users MeeUng �2
2018-2019 System December 27, 2018 ALMA/NRO/ASTE Users MeeUng �3
New mm/sbmm TAC members (2018- • Chair: Yoichi Tamura (Nagoya Univ.) • Miju Kang (KASI/Korea) • Naomi Hirano (ASIAA/Taiwan) • Sachiko Onodera (Meisei Univ.) • Takeshi Sakai (Univ. of Electro-CommunicaUons) • Oct 11 th , 2018 (1 st meeUng), Jan 8 th , 2019(next meeUng) December 27, 2018 ALMA/NRO/ASTE Users MeeUng �4
Open-Use: Schedule 8/1 Call for Proposal 11/1 Call for Proposal 9/1 Deadline 12/1 Deadline 9/10 Send proposals to referee 12/10 Send proposals to referee 10/11 TAC 1/8 TAC 5/15 End NRO 45-m open-use 12/15 Start NRO 45-m open-use We have two deadlines also including short programs, but one deadline for Large and Backup programs. December 27, 2018 ALMA/NRO/ASTE Users MeeUng �5
Open-Use: Proposals 2018-2019 (2017-2018) 2018A 2018B Category Accepted Submi.ed General 25+21= 46 (55) 11+ (26) Joint - (-) - (-) Short 2+8= 10 (12) 1+ (9) Backup* 2 (1) 2 (1) Large >200 hr 3 (1) 1 (1) +1** DDT 0 (0) + (0) Total 32+29= 61 (69) 16+(37) GTO 0 (2) 0 (2) Foreign countries 9+16= 25 (21) 3+ (11) *DomesUc only **accepted in 2017 # Proposals for 2017 was 69, but we received 61 for 2018 (~88%) # Proposals from foreign countries for 2018A was 9, and we received 16 for 2018B December 27, 2018 ALMA/NRO/ASTE Users MeeUng �6
LST range distribuUon 2017-2018 Requested/Accepetd Time (NRO45m) 250 Requested Accepted Carry over 200 150 Hour 100 50 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 LST[Hour] G.C. Range of LST =8 - 16 hr was largely undersubscribed in semester 2018A December 27, 2018 ALMA/NRO/ASTE Users MeeUng �7
←One deadline 40 Joint DDT Edu Large 0 20 60 Short 80 100 120 2012 2013 2014 2015 2016 2017 Approved ←ALMA cycle 1 Back-up General 120 Proposal # 2017 2016 2015 2014 2013 2012 2018 100 80 60 40 20 0 Proposals TransiUon �8
Foreign 2017 Approved 2012 2013 2014 2015 2016 2017 120 100 80 60 40 20 0 Foreign Domestic 2018 2016 2015 2014 2013 2012 120 100 80 60 40 20 0 Proposal # Foreign Proposals TransiUon �9
Convert to CASA • Not yet open the analysis in CASA – It is necessary to apply a special merge for analysis • If you want to use, ex., we need to parUcipate in risk sharing including test & evaluaUon as a cooperaUon for us • Please let me know directly to Umemoto or Torii who is a manager of analysis, if you do not mind. �10
Recommend
More recommend