nro open use
play

NRO Open-use Tomofumi Umemoto (NRO) Call for Proposals 2750 hrs - PowerPoint PPT Presentation

NRO Open-use Tomofumi Umemoto (NRO) Call for Proposals 2750 hrs for open-use including VLBI H22, H40, Z45, T70 and FOREST open Spectral Window Mode opens only for FOREST Dump Ume for OTF mode is allowed to be not only 0.1s but


  1. NRO Open-use Tomofumi Umemoto (NRO)

  2. Call for Proposals • 2750 hrs for open-use including VLBI • H22, H40, Z45, T70 and FOREST open • Spectral Window Mode opens only for FOREST • Dump Ume for OTF mode is allowed to be not only 0.1s but 0.04s • Not open for Joint with ASTE telescope • Remote observaUon from limited UniversiUes in Japan, Mitaka, ASIAA/Taiwan, and KASI/Korea is allowed • Simultaneous observaUon of H22/H40 is offered from semester 2018B December 27, 2018 ALMA/NRO/ASTE Users MeeUng �2

  3. 2018-2019 System December 27, 2018 ALMA/NRO/ASTE Users MeeUng �3

  4. New mm/sbmm TAC members (2018- • Chair: Yoichi Tamura (Nagoya Univ.) • Miju Kang (KASI/Korea) • Naomi Hirano (ASIAA/Taiwan) • Sachiko Onodera (Meisei Univ.) • Takeshi Sakai (Univ. of Electro-CommunicaUons) • Oct 11 th , 2018 (1 st meeUng), Jan 8 th , 2019(next meeUng) December 27, 2018 ALMA/NRO/ASTE Users MeeUng �4

  5. Open-Use: Schedule 8/1 Call for Proposal 11/1 Call for Proposal 9/1 Deadline 12/1 Deadline 9/10 Send proposals to referee 12/10 Send proposals to referee 10/11 TAC 1/8 TAC 5/15 End NRO 45-m open-use 12/15 Start NRO 45-m open-use We have two deadlines also including short programs, but one deadline for Large and Backup programs. December 27, 2018 ALMA/NRO/ASTE Users MeeUng �5

  6. Open-Use: Proposals 2018-2019 (2017-2018) 2018A 2018B Category Accepted Submi.ed General 25+21= 46 (55) 11+ (26) Joint - (-) - (-) Short 2+8= 10 (12) 1+ (9) Backup* 2 (1) 2 (1) Large >200 hr 3 (1) 1 (1) +1** DDT 0 (0) + (0) Total 32+29= 61 (69) 16+(37) GTO 0 (2) 0 (2) Foreign countries 9+16= 25 (21) 3+ (11) *DomesUc only **accepted in 2017 # Proposals for 2017 was 69, but we received 61 for 2018 (~88%) # Proposals from foreign countries for 2018A was 9, and we received 16 for 2018B December 27, 2018 ALMA/NRO/ASTE Users MeeUng �6

  7. LST range distribuUon 2017-2018 Requested/Accepetd Time (NRO45m) 250 Requested Accepted Carry over 200 150 Hour 100 50 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 LST[Hour] G.C. Range of LST =8 - 16 hr was largely undersubscribed in semester 2018A December 27, 2018 ALMA/NRO/ASTE Users MeeUng �7

  8. ←One deadline 40 Joint DDT Edu Large 0 20 60 Short 80 100 120 2012 2013 2014 2015 2016 2017 Approved ←ALMA cycle 1 Back-up General 120 Proposal # 2017 2016 2015 2014 2013 2012 2018 100 80 60 40 20 0 Proposals TransiUon �8

  9. Foreign 2017 Approved 2012 2013 2014 2015 2016 2017 120 100 80 60 40 20 0 Foreign Domestic 2018 2016 2015 2014 2013 2012 120 100 80 60 40 20 0 Proposal # Foreign Proposals TransiUon �9

  10. Convert to CASA • Not yet open the analysis in CASA – It is necessary to apply a special merge for analysis • If you want to use, ex., we need to parUcipate in risk sharing including test & evaluaUon as a cooperaUon for us • Please let me know directly to Umemoto or Torii who is a manager of analysis, if you do not mind. �10

Recommend


More recommend