NMCB Ops Officer Perspective Iraq/Kuwait Deployment Brief to: SAME Mid-Atlantic Regional Conference 10 OCT 07
Overview • Deployment Overview – Deployment Timeline – Mission – Organization – Locations • Deployment Highlights
Timeline for Deployment Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 6 20 4 18 1 15 5 19 3 17 7 21 5 19 2 16 6 20 CSE Training Iraq MEF Support CFLCC Support Deployment Summary: • Advanced Party Deploys: 26 Jul 05 • Iraq MEF Support: 15 Aug 05 to 25 Nov 05 • CFLCC Support: 18 Nov 05 to 28 Feb 06 • Delayed Party Re-deploys: 28 Feb 06
Mission – On 26 July 05, NMCB THREE will deploy a responsive, flexible general engineering / construction force with Convoy Security Element (CSE) capabilities. – Provide general engineering support to II MEF (FWD), ARCENT CFLCC, and JTF HOA.
Organization CO STAFF Safety Officer COMMAND MASTER CHIEF Military Advisor CMAA XO OPS COMM SPECIAL STAFF ADMIN TRAINING SUPPLY X1 - Chaplain LCDR Stasick X2 - Dental X3 - Legal – MLO X4 - Medical INTEL / WEAPONS OPS STAFF S3A Asst Ops – – Ops Chief S3C S3E – Engineering Off Quality Control S3QC - HQ COMPANY ALFA COMPANY BRAVO COMPANY CHARLIE COMPANY DETAILS MOBILITY COMPANY
Deployment Locations Det Rota Det Souda Bay Kosovo IA Iraq Mainbody CFLCC -Camp Arifjan (MB) 3 3 -Camp Buehring 3 3 3 -Camp Virginia 3 3 -Ali Al Saleem 3 3 -Kuwait Naval Base 3 Det PAPA -K-Crossing 3 -Navistar Gulfport -Camp Victory 3 -Ash Shuaybah Det Bahrain Det GTMO Det Horn of Africa ABO/KAAOT OILPLAT -Camp Lemonier, Djibouti Qatar IA -Adangalina, Djibouti Det Andros -Tadjura, Djibouti -Nairobi, Kenya Det Seychelles -Manda Bay Kenya -Harer, Ethiopia -Hurso, Ethiopia -Gode, Ethiopia
Iraq Deployment Highlights • Camp Fallujah – MHG Camp Maintenance – Pump House O & M – Election Support • Ramadi \ Taquaddum – Hardened Galley’s – SWA Hut Construction – Iraqi Security Force Camp – Timber Tower • Kalsu – Camp Maintenance – Electrical Upgrades – Dust Abatement Motor – Force Protection Improvements – Super SWA Huts in the RDF – MHG Camp Maintenance • Al Asad – Hardened Galley (CG) – Runway Joint Repair – ISF Camp Support – Coalition Forces FOB Construction
CENTCOM Laydown II MEF CJSOTF CJSOTF HOA HOA Al Qaim Ar Ramadi NAVCENT NAVCENT NMCB 22 DET NMCB 3 DET Haditha NMCB 22 DET NMCB 22 DET Corregidor Rawah NMCB 3 DET Al Fallujah NMCB 3 DET NMCB 22 DET 30 NCR Al Asad NMCB 3 NMCB 3 DET NMCB 22 DET Al Taqaddum NMCB 22 30 NCR DET NMCB 4 DET NMCB 22 DET Korean Village NMCB 22 DET Kalsu HOA HOA (Kenya) NMCB 3 DET (Ethiopia) NMCB 3 DET Kuwait NMCB 3 DET 22NCR FWD NMCB 3 NMCB 21 DET HOA 30 NCR DET (Djibouti) Bahrain NMCB 3 DET NMCB 3 DET NMCB 21 DET Command Element NMCB 3 DET 3 U n ite d S ta te s Flee t F o rc e s O p e ra tion a l R ea d in e ss E ffe c tiv e n es s P rim a cy U nite d S ta te s F lee t Fo rc e s O p e ra tio na l R ea d in e ss E ffe c tiv e n es s P rim a cy
Hardened DFAC
MEF Construction Comm Tower, Al Asad SWAHut, TQ Bridge Repair, Habbiniyah Drainage Improvements Timber Tower, Ar Ramadi Water Well, Camp Rawah Runway Repairs, Al Asad Electrical Upgrades
ISF Base Camp
Convoy Security Teams
Camp Maintenance / Force Protection
IT CAN’T GET ANY BETTER THAN THIS! KUWAIT
Mission in Kuwait • Setup Mainbody Site at Camp Arifjan • Setup two Detail Camps – Camp Virginia – Camp Buehring • Completed 58 projects and over 22,596 mandays of construction at 11 different locations • 19 Projects partially completed and turned over to NMCB SEVEN • Active/Reserve integration • Joint operations
Navistar UNCLASSIFIED -Southbound Lane Improvements Kuwait Project Locations -South Immigration Lot Improvements K Crossing Camp Buehring -ASP Site Prep -ASR Dallas Improvements Udairi Range -Erect 4 LAMS -South Road Repairs -Erect 5 Sunshade PEBs -Road Maintenance Camp Virginia -Manholes For Fiber Optic Cables -Construct Base Roads SPOD -PEB Sunshades -Construct Height Check Arch -Redeployment Yard ICODE Prep Ali Al Salem/Camp Moreell/Army LSA -ECP Sun Shade -USO Tent Improvements -ATOC Briefing Room Camp Victory -PX Construction KCIA / APOD -Bus and Convoy Route Upgrade Arifjan -POL Fuel Transfer Yard PEB -Concrete Loading Ramp -Drainage Improvements -Construct Secure Room KNB -TNOSC Pad Expansion -Staging Yard improvements -Concrete Loading Ramp UNCLASSIFIED
Camp Arifjan
Ali Al Salem ECP Sunshade
Camp Virginia Utility Projects
ECP Drainage/Road Repair Camp Virginia
Camp Buehring LAMS
K-Crossing • 2KM long border crossing • Over 3,000 manday project • 70,000 metric tons of asphalt • 1,800 cubic meters of concrete • Completed 38% of project
Det HOA • Completed over 8,200 mandays of work at 8 different det sites stretched across three countries • Drilled three water wells and repaired another • Rapid response to Nairobi building collapse • Completed a design/build boat ramp in Kenya
Work Breakdown FOB S uppor t M i nor P r oj e c t s 2 % Ea r t hwor k 8 % 14 % For c e P r ot e c t ion 2 % Conc r e t e & P a v ing 5 % Ca mp S e t - up Wood S t r uc t ur e s 15 % 12 % M e t a l S t r uc t ur e s 5 % Ca mp M a sonr y M a i nt e na nc e S t r uc t ur e s 17 % 5 % Fa br i c S t r uc t ur e s I nt e r i or Finish 1% 7 % Wa t e r We l l s El e c t r ic a l 3 % P l umbi ng 1% 3 %
Deployment Summary • 112 Projects Completed • 64,218 MD’s Completed • Personnel Deployed to Iraq and Kuwait – 570 Personnel in Iraq – 877 Personnel in Kuwait (NMCB 21 and 63rd CSE) – 6 CSEs completing over 26,000 miles and 200 missions in Iraq
QUESTIONS?
Recommend
More recommend