NDR Design: Preliminary Progress Report Timeline for NDR Task - PowerPoint PPT Presentation

NDR Design: Preliminary Progress Report Timeline for NDR Task Due Month NDR Specifications 7 NDR Version 1 15 NDR Version 1.5 22 Report on NDR operational performance at the end of TOP1 23 NDR Version 2 (Final Version) 35 Report on


  1. NDR Design: Preliminary Progress Report

  2. Timeline for NDR Task Due Month NDR Specifications 7 NDR Version 1 15 NDR Version 1.5 22 Report on NDR operational performance at the end of TOP1 23 NDR Version 2 (Final Version) 35 Report on NDR operational performance at the end of TOP2 36

  3. NDR Manager Duties  Translate user request (via web interface) to OPeNDAP query  Identify DR that provides requested coverage  Send properly formatted request to OPeNDAP server for data  Transfer data to OSM server and initiate computations  Collect results from OSM server  Perform any required translations, gridding, etc.  Send OSM results to web interface for display  Cataloging of data

  4. NDR Version 1  Objective  Implementation, testing, and debugging of NDR Manager software, and modules (if any) for the OpenDAP server  Priorities  Fast turnaround on software development  Minimize the effect of external factors

  5. Version 1 Workflow PyDAP FTP/OPeNDAP or Python + Hyrax WCS SSH/(?)

  6. Months 7 to 15 tasks University of Cyprus OSM Partners   Develop NDR Manager Make OSM results to be   software version 1.0 compatible with data exchange specifications. Test with locally downloaded  data. Install and configure OSM  server for NDR access Advise/assist other partners  in installation and SSH, Python, …  configuration of OPeNDAP DR Partners servers.  Make DR data to be Collaborate with web   compatible with data interface developer on data exchange specifications. exchange. Install and configure local  OPeNDAP server.

  7. Versions 1.5 & 2 Workflow DR 1 DR 2 DR n

  8. NDR Version 1.5  Objective  Integration of NDR Manager with remote OPeNDAP servers  First TOP  Priorities  Testing of NDR integration

  9. NDR Version 2  Objective  Debugging of issues identified during TOP1  Second TOP  Priorities  Readiness for final deployment

  10. Months 15 to 35 tasks University of Cyprus OSM Partners   Develop NDR Manager Maintain and operate local   software version 1.5 OSM server. Test with remote OPeNDAP  DR Partners  servers Maintain and operate local  Advise/assist other partners  OPeNDAP server. in operation of remote OPeNDAP servers. First TOP  Improve version 1.5 based on  results on first TOP to produce version 2.0.