Menokin Mockup Progress Report October 2015 Existing conditions: - PowerPoint PPT Presentation

Menokin Mockup Progress Report October 2015 Existing conditions: Northwest corner February 2015 Existing conditions: Inside north wall @ NW corner February 2015 Research: Replacement stone Research: Cintec anchors Rubble pile relocation


  1. Menokin Mockup Progress Report October 2015

  2. Existing conditions: Northwest corner February 2015

  3. Existing conditions: Inside north wall @ NW corner February 2015

  4. Research: Replacement stone

  5. Research: Cintec anchors

  6. Rubble pile relocation Partially complete June 2015

  7. Samples: Mortar samples June 2015

  8. Research Stone inventory by summer interns June-July 2015

  9. Research: Stone Inventory -Stones placed on scrims July 2015

  10. Research: Measured drawings

  11. Research: Displaced stones June 2015

  12. Research: Displaced basement window jamb stones

  13. Documentation: Corner reference points September 2015

  14. NE NW SW Documentation: Corner reference points September 2015

  15. Documentation: Corner reference points September 2015

  16. Northwest corner February 2015

  17. West wall at SW corner September 2015

  18. Archaeology: by DATA Investigations June-July 2015

  19. Documentation: Painted stones

  20. Archaeology: Ground profile at north wall September 2015

  21. Removed parging inside north wall August 2015

  22. Repair: Products & equipment

  23. Grouting: Seal openings & flush out August 2015

  24. Grouting: Filled tubes

  25. Cintec anchor hole locations September 2015

  26. Plywood excavation protection September 2015

  27. Stone repair: Projecting stone markings September 2015

  28. Stone repair: Drawing planning frame September 2015

  29. Documentation: Below grade measured drawings

  30. Stone repair: Removing displaced ashlar stones September 2015

  31. Stacco treatment: Sound testing stucco September 2015

  32. Stacco treatment: Tools September 2015

  33. Staccotest: Removed stucco September 2015

  34. Stacco test: Reinstalled stucco & limewash September 2015

  35. Masonry repair: Removed loose internal material September 2015

  36. Masonry repair: Removed loose internal material September 2015

  37. Masonry repair: NW corner stones September 2015

  38. Masonry repair: Pinning & epoxy September 2015

  39. Masonry repair: Pinning & epoxy September 2015

  40. Masonry repair: Cramp sample

  41. Stone repair: Methodology October 2015

  42. Masonry surveys: CCTV flues & IRT, GPR, & Metal Detection

  43. Masonry repair: Bird’s beak pointing sample

  44. Masonry repair: Core drilling rig

  45. Masonry repair: Reset basement window jamb stones

  46. Masonry repair: Masonry bees