MARIA reactor for medicine, nuclear and material research Michał A. Gryziński National Centre for Nuclear Research, Poland 1 Sydney, 5.12.2017
Presentation plan 1. MARIA reactor overview 2. „ Horizontal ” science 3. „ Vertical ” science 4. Scientific cooperation and future plans 2/17
Reactor Laboratory for Nuclear, Material and Biomedical Research 3/17
Reactor Laboratory for Nuclear, Material and Biomedical Research 4/17
Reactor Laboratory for Nuclear, Material and Biomedical Research 5/17
Relicensed in 2015 until 2025 (expected to 2035)
Field of scientific interest Nuclear: Dosimetry: Medical: Physics: fuel, n-g radiation radiography, BNCT, materials, high dose, neutrons radioisotope shieldings active St Star arting ting pr progr ogram ams 2019 19-2021: 2021: Cerad (cyclotron ) + Mo „ Ś wierk” Material Ma erial re rese search arch 7/17
Reactor Laboratory for Biomedical Research Maintenance Administration 8/17
Expe peri rimental ental ha halls lls physical 2019/2020 radiobiology material 2018 2019 9/17
Hor oriz izontal ontal channel annel facil ciliti ities es In progress Starting H3-H7 Existing H1/H2 10/17
In-core In ore ex expe peri riments ments HOT CELL SPENT FUELS IN TECHNOLOGICAL CONTROL RODS CHANNELS DRIVE MECHANISM SLUICE 1 2 TECHNOLOGICAL POOL +.6.33 +.6.33 3 R 3250 R 3250 +4.1 +4.1 12250 12250 SPENT FUEL +2.25 +2.25 REACTOR +1.1 +1.1 R 2250 R 2250 HORIZONTAL CHANNEL -2.85 -2.85 -2.85 -2.85 1,2 – existing: rabit, hotcell 3 – projected: hT-loops, biol, Si, high A
In In-core ore ex expe peri riments ments Large samples Rabit system Mo, Ho, Y... 12/17
Radiobiological laboratory Transportage passage H1 channel – radiobiological samples H2 channel - neutron beam Expected date of finalize: May 2019
H2 chann hannel el facil cility ity Reactor core Irradiation room Loc ocation of of the he H2 cha hanne nnel Preparation Control room room 14/17
Progr Pr ogress ess in n ra radi diobiologi obiological cal st stat ation ion 3 4 1 1. Converter 2 2. Intermediate channel 3. Discs 4. Shutter 15/17
HZB ins nstruments truments H3 – Flat-Cone ne Diffr frac actometer ometer H4/5 5 – 2-Axis Axis-Diffr Diffrac actomet meter er H6 – Foc ocus using ing Pow owder der Diffract ractometer eter H7 – 4-Circl ircle e Diffr frac actomet meter er H1/H2 16/17
14 14 Me MeV con onverte verter Ma Mate teria rial mo modi difi ficatio ation 17/17
MR MR-2 ex expe perimental rimental el element ements 38mm Ex Expe periments ments ins nside de fu fuel el el elem ement ent (TVEL EL pr prod oduc ucti tion on in n Jun une 2017) 2017) 18/17
Int ntern ernational ational sc scienti entific fic coo oope peration ration iology Ne Neobor obor Medica ical/radiob radiobiology Rad adio iois isot otope ope POLATOM/ TOM/NW NWMI Mat aterial ial LBM/Culham lham PhD hD pr prog ogramm amms Stud St uden ents ts pr prac actise tise (m. m.gry gryzin zinski ski@ncb @ncbj.g j.gov.pl ov.pl) 19/17
Thank you for your attention ! m.gryzinski@ncbj.gov.pl 20 20
Thank you for your attention ! m.gryzinski@ncbj.gov.pl 21 21
Welcome to Poland, Warsaw … MARIA reactor for medicine, nuclear and material research 22/9 Welcome to Świerk, MARIA reactor … Poster #350 m.gryzinski@ncbj.gov.pl
MARIA reactor for medicine, nuclear and material research m.gryzinski@ncbj.gov.pl 23/9 Poster #350 23 23 23 23 23 m.gryzinski@ncbj.gov.pl
Radiobiological and medical laboratory
MARIA reactor
MARIA reactor Kanał H2
MARIA reactor H2 channel
„Neutron production ” for medical and radiobiological research Core basket Medial channel Filters 235 U-converter Reactor pool Ściana basenu H2 experimental room
235 U conwerter The source of neutrons – 24 U plates When expediced to the technological pool it is possible to shuffle and rotate And to check for leakage Authonomic cooling system
Medial channel Positioned between the basket core and concrete shielding 1m long, 25cm of diameter Nitrogen exchange water inside Nitrogen inlet Filling/removing time ~90sec Converter side Strona Kanału H2 Zamknięty kanał pośredni – pierwsza bariera dla neutronów
Filters and shutters Shutter: • 5 cm PP Filters: • 3 cm B 4 C • 2 cm B 4 C • 26 cm Pb • 25 cm Pb Pumpuing the water out of the medial channel and turninng shuttera = opening the beam for H2 experiments
Radiobiological laboratory Transportage passage H1 channel – radiobiological samples H2 channel - neutron beam Expected date of finalize: May 2019
H1/H2 - experimental rooms Reactor pool H2 channel Experimental room Transportage passage Preparation room Entrance
Recommend
More recommend