Presented to Council January 19 th , 2016 More images 1
1. Capital Projects - 25 Year Forecast 2. Public Works 3. Emergency Services 4. Library 5. Parks & Recreation 6. Administration – Town Hall 7. Misc Items – Centre Dummer Cemetery, Historical Committee, Cenotaph, Township Signs 8. Policing 9. Budgeted Expense 10. Trans to Reserves 11. Budgeted Revenue 12. Trans from Reserves 13. Levy Requirement 2
Web Page (From 2015) $10,000 Tanker #4 Warsaw Fire Hall $285,000 Road Deficit $169,589 Community Centre Repairs $25,000 Zoning By-Law $20,000 Public Works Facility (Tender Documents/Specifications) $125,000 Bunker Gear (28 sets) $55,000 $689,589 All Funded with reserves 3
Phase II of the Asset Management Plan suggests that tax revenues be increased by 1.3% each year for the next 10 years solely for the purpose of phasing in full funding for the following asset categories: Buildings, Building Improvement, Rolling Stock, Equipment, Land Improvements, Computer Hardware & Software. This has been accommodated in the 25 year forecast starting in 2017. 4
Dummer-Asphodel Road – Sect 16 – 3.3 km County Rd 38 to 400 m E of 4 th Line (at bridge) $63,185 Dummer-Asphodel Road - Sect 16 – 1.1km From Bridge to County Rd 8 $21,062 Dummer-Asphodel Road – Sect 15 – 1.4 km Carlow Line to County Rd 38 $12,250 5
Nassau Road – Sect 146 – 2.9 km 9 th Line to County Rd. 4 $50,750 Stenner Road – Sect 100 - .5 km Highway 28 to North Limit $8,750 Moodie Drive – Sect 102 - .8 km Stenner Road to East Limit $14,000 6
Webster Road – Sect 29 – 5.6 km County Rd 40 to County Road 8 $98,000 Ayotte Crescent – Sect 144 - .2 km Wide Area 8 th Line Road to East Limit $14,000 Douro 8 th Line Road – Sect 143 km County Road 32 to County Road 4 $37,471 7
Sawmill Road – Sect 68 – 2.3 km 3 rd Line Dummer to 4 th Line Dummer $24,368 Indacom Drive – $12,984 8
Douro 7 th Line – Sect 158 – 1.9 km Division Rd to North Limit $42,685 Douro 7 th Line – Sect 145 – 1 km of 1.7 km County Road 4 to North Limit $22,466 Douro 3 rd Line – Sect 165 – 3.3 km Division Road to County Road 8 $94,227 9
6 th Line Road South Dummer – Sect 31 – 1.9 km Webster Road to North Limit $42,469 6 th Line Rd South Dummer – Sect 200 – 3.1 km Webster Road to County Rd 8 $69,291 5 th Line Road South Dummer – Sect 32 – 2 km Webster Road to North Limit Brushing $14,200 Surface $51,107 10
Bradfield Road – Sect 163 – 1.2 km Douro 7 th Line Road to West 1.2 km $26,887 12 th Line Dummer – Sect 24 – 2 km of 6.3 km Forced Road Section to North Limit $45,253 Centre Dummer Road – Sect 55 – 7.9 km 4 th Line Road to County Road 40 $118,101 11
Golf Course Road – Sect 5 – 1.7 km of 2.2 km McCracken's Landing East 1.7 km Brushing $12,600 Ditching $44,339 Surface ( Return to Gravel) $38,883 12
Ministry Of Natural Resources Directive 3 Year Project Approximately 637 feet Building Slope and Top Soiling Project$60,000 2016 - $26, 665 2017 - $16, 660 2018 - $16, 660 The total project budget may vary depending on the distance that $26,665 budget allows to complete in 2016. 13
The majority of this project will be delayed to 2016. The original budget was $110,000. With the approved upgrades the budget is now $200,140. Sidewalks, Boulevards, Engineering/Consultants 14
Every two years the Township is required to hire an engineer to perform bridge/culvert inspections. We have 10 structures that need inspecting in 2016. $5,200 15
The last roads needs study was completed in 2009. It’s recommended to have the roads appraised every 5 years. It seems that with funding programs asset appraisals are part of the process. It is a good risk management practice. It is estimated that a roads needs study would be $15,000. This item is not included in the 2016 budget but it will need to be included in the 2017 budget. 16
Annual software costs Labour to monitor Each unit Risk management – reporting We have not included GPS units in the 2016 budget but again this is an item that we should consider in the 2017 budget. 17
To summarize the 2016 Road Capital work: Surface Treated Roads: $356,820 Gravel Roads: $622,508 County Road 4 $200,140 Total Road Project ect Capital tal: $1,179,4 ,468 6 th Line Pit Rehabilitation $26,665 Funded nded wi with: Gas s Ta Tax $2 $206 06,89 894, 4, Re Reserv erves es $558,589, , Fund nding ing $25,000, , Loan an $200,140, , DC $25,000,Tax ,Taxes es 18
Fire Hose $5,000 Ice Water Rescue Equip $10,000 Inflatable boat, 4 suits, rescue vests, - helmet, rope SCBA Bottles $5,000 Fund nded ed wi with DC $4,000, Taxes 19
Books (Including E-Books) $13,500 Shelving $ 5,000 Fund nded ed wi with DC $5,000, Reserves erves & T Taxes es 20
Condenser and Brine Header Pipe $61,056 Catwalk to Condenser $15,000 Scraping and Painting of Steel Columns and Control Joints $40,000 Total $116,056 Fund nded d by Douro CC re reserves ves $25,000, Taxes 21
Scraping and Painting of Steel Columns and Control Joints $50,000 Parking Lot Retaining Wall (Verbal) $30,000 Cooling System for Hall $17,000 - Includes $7,000 from 2015 budget Fund nded ed with Capital tal Reserves erves $25,000, , Warsaw saw CC Reserv erves es $15,000, , Taxes 22
Truck to replace 2005 half ton - $32,000 Fund nded ed wi with reser serves. ves. 23
Website Update (from 2014) $10,000 Zoning By-law (from 2014) $20,000 $30,000 Ergonomic Office Chairs (10) $6,000 Folder/Inserter $12,050 Fund nded ed through ough Reserves erves 24
Repointing Bricks (from 2015) $10,000 Flat Roof Replacement (2015) $20,000 Funded nded wi with res eser erves ves $3 $30, 0,00 000 25
Centre Dummer Cemetery $13,000 - Fence, Monument Stone Fund nded ed wi with reser serves ves Historical Committee - $10,000 - Lime Kiln Repair interior walls, cover - Plaque Funded nded wi with res eser erves ves $6 $6,00 000, 0, taxes es 26
Cenotaph $26,894 Fund nded ed with grant nts $15,1 5,193, 93, reserves rves $7,15 ,157, taxes Signs($14,000 from 2015) $14,000 - Welcome signs on Highways - Office Sign with landscaping - Hamlet Signs – 2016 Funded nded wi with res eser erves ves $1 $14, 4,00 000, 0, taxes es 27
The 2015 policing budget was $834,077 and the 2016 budget will be $1,021,964, a $187,887 increase. Fund nded ed wi with taxes. es. 28
Investment in TCA $2,039,074 Operating $5,451,249 Transfer to Reserves $ 933,548 Total Expenses: $8,423,871 29
25 Year Capital Forecast $580,014 Rd Equip Reserve $ 52,175 (This is from the Equip Rental Rates less the expense of running the equipment) Gas Tax Reserve $206,894 Retirement Benefits Reserve $ 7,100 Policing Reserves $ 5,000 30
Severe Weather Reserve $ 25,000 Election Reserve $ 10,000 Solar Panels $ 25,000 Town Hall $ 5,000 Self Insurance $ 12,240 Cenotaph Reserve $ 5,125 Total Transfer to Reserves: $933,548 31
32
Revenue $ 1,258,117 (Contracts, Permits & Fees, Rental, Sales, Other) Internal Equipment Rental $ 498,019 Federal Grants (Gas Tax) $ 222,087 Provincial Grants (OMPF, OCIF) $ 645,928 Transfer From Reserves $1,470,235 Total Revenues: $4,094,386 33
25 year forecast $689,589 Corporate Reserve $ 26,405 Development Charges - Roads $ 25,000 - Library $ 5,000 - Parks $ 2,000 - Fire $ 4,000 Fire Reserve $ Indacom Drive Reserve $ 12,984 Gas Tax Reserve - Roads $206,894 34
Town Hall Reserves $ 30,000 Douro CC Reserves $ 25,000 Self Insurance $ 12,240 Parkland $ 5,000 Police Advisory Committee $ 510 Retirement Benefits $ 5,454 Roads Construction $281,151 Cemeteries $ 13,000 Library $ 4,000 Source Water Protection $ 29,181 35
Economic Development $ 14,000 Corporate Management Equip $ 18,050 Historical Reserve $ 6,000 Parks Equipment $ 32,000 Cenotaph $ 7,157 Warsaw CC (Fr 2015) $ 15,000 Total From Reserves: $1,470,235 36
37
2015 Budgeted Requirement from Tax Levy: $4,076,661 2016 Estimated Requirement from Tax Levy: $4,329,485 Increase for 2016: $ 252,824 This is a required levy percent increase of 6.2% 38
Recommend
More recommend