introduction qenos update since november acncg
play

Introduction Qenos - PowerPoint PPT Presentation

Introduction Qenos update since November ACNCG Qenos actions arising (nil raised) Community Regulatory Interface 2015 Qenos ACNCG Focus Areas 2014


  1. �������������������������

  2. Introduction Qenos update since November ACNCG � Qenos actions arising (nil raised) � Community � Regulatory Interface 2015 Qenos ACNCG Focus Areas 2014 Performance Trends

  3. Community � December & March EMT meetings held � Consultation − Community briefing & discussion on Qenos Noise EIP conducted − EMTs moved to evening − several new members have joined EMT − Qenos SHE Excellence Awards � Complaints − 3 noise complaints in January for flare noise from Olefins after steam supply interruption.

  4. Regulatory Interface � EPA • Discussed draft groundwater Quality Management plan with EPA in December • Liaising with EPA about future of accredited licence program • Regulatory noise limits established in residential areas endorsed by EPA • CWW Minor Sulphide excursion for Olefins Trade waste 15 th Dec & 30 th Jan. • • Customer notified non compliance in place until ETP clean completed ETP clean executed without complaints or non compliances • � Worksafe Nothing to report

  5. 2015 Goals Aspect Aim November 2014 ACNCG April 2015 ACNCG Status Reduce injury rate • 1 injury for the quarter, Injury rate better than 2014 and plan. Improve SHE performance Reduced community noise • One gearbox installed in March. • Implementation of Plastics recycle Performance being evaluated. gearbox investment. • F-651 scope evaluation in 2016. • Scope F-651 noise treatment. • Complaints related to steam outage in • Reduced flare noise complaints. January, • Community noise monitoring program in • Community noise monitoring at Charles place. Road & Galvin street in February And March Qenos is anticipating 2015 to be a further • Change in global oil price has also improvement in overall Business, however there driven down regional PE pricing. Business is a general downturn across all sectors of Outlook • Far more challenging year than we industry at present. anticipated. Olefins plant will continue to focus upon ethylene • Significant feedstock shortfall in Feb & yield optimisation and energy utilisation. March. April and May are also expected to be lower. Esso industrial issues. Consolidate investments Polymer plant reliability improvements and • Based upon the first quarter ethane performance enhancement to achieve 200kT PE shortfall and continuing restrictions in production. supply, PE volume will be well below plan. Support the major investment in Botany • Turnaround planning process is on

  6. ������������ ������������������������

  7. Polyethylene production � 93% of production plan 240 220 200 180 KT 160 140 120 100 2010 2011 2012 2013 2014

  8. Environment trends � Significant flare reduction reducing complaints. � 2 Solvent LOC at Resins 30 25 20 Events per Annum 15 10 5 0 2010 2011 2012 2013 2014 Community complaints Environment incidents

  9. Water Usages � Steam reductions. � On site water reuse. * No recycled water available in 2014 Water Waste supply water 3,000 1200 2,500 1000 ML / year 2,000 800 ML / year 1,500 600 1,000 400 500 200 0 0 2010 2011 2012 2013 2014 Alternative Water supply Mains Water Supply Waste Water

  10. Water Efficiency � Reduced steam production. � Increased on site water reuse. Water Waste supply water 20 10.0 KL / Tonne PE KL / Tonne PE 16 8.0 12 6.0 8 4.0 4 2.0 0 0.0 2010 2011 2012 2013 2014 Recycled water Water Consumption Waste Water

  11. Greenhouse Gas Emissions � Altona Revamp & Cogeneration projects � Steam savings Tonnes CO2/Tonne PE Emissions KT CO2e) 1,000 5.00 800 4.00 600 3.00 400 2.00 200 1.00 0 0.00 2010 * 2011 * 2012 * 2013 * 2014 * Purchased Electricity Emissions On site emissions Emissions Intensity

  12. Energy Efficiency � Altona Revamp & Cogeneration projects � Steam savings 60.0 55.0 50.0 GJ/T PE 45.0 40.0 35.0 30.0 2010 2011 2012 2013 2014 Energy Efficiency

  13. Waste � Prescribed waste in 2014 • Resins - pond cleans 50t • Resins – mud-hole waste 48 t • Olefins - caustic tank clean 41t 1000 800 Tonnes 600 400 200 0 2010 2011 2012 2013 2014 General waste Prescribed Waste to landfill Recycled waste

  14. Emissions � Reduction in boiler firing. � Reduced flaring � Reduced fugitive emissions 1000 800 Tonnes 600 400 200 0 2010* 2011* 2012* 2013* 2014* VOC NOX SOX * Financial year

  15. Emissions � Minor increase in pump seal emissions 5 4 3 Tonnes 2 1 0 2010* 2011* 2012* 2013* 2014* Benzene Financial year

  16. 2013 vs2014 Aspect Aim 2013 vs 2014 Reduce injury rate - TRIR 0.72 0.46 Improve SHE performance Reduce flare impact on community 2929t 850t With improved capacity and efficiency across the Business Altona Plants, coupled with the reduced $A Qenos Outlook 300% expects 2014 to be see an improvement in overall Business performance - EBITDA Optimise the Olefins site for further yield 1% increase in yield Consolidate improvements and energy efficiencies. investments 42 GJ/T 37 GJ/T Optimise steam generation from cogeneration plant 29 T/Hr 34 T/Hr Maximise ethylene/PE production across Altona 5 kT increase in Plants – 200kta ethylene production