human landing system hls
play

Human Landing System (HLS) 2020 1 1 D-20-13184_HLS_Releaseble - PowerPoint PPT Presentation

Human Landing System (HLS) 2020 1 1 D-20-13184_HLS_Releaseble HLS Mission 2 D-20-13184_HLS_Releaseble Human Lander on the Moon Capacity: Two Crew Initially Growing to Four Crew Members Will Rendezvous with the Orion


  1. Human Landing System (HLS) 2020 1 1 D-20-13184_HLS_Releaseble

  2. HLS Mission 2 D-20-13184_HLS_Releaseble

  3. Human Lander on the Moon Capacity:  Two Crew Initially  Growing to Four Crew Members Will Rendezvous with the Orion Multi-purpose Length: 9.4 Meters Crew Vehicle and Return to Earth in a Splashdown Recovery Width: 4.0 Meters Height: 4.8 Meters 3 D-20-13184_HLS_Releaseble

  4. HLS Crew Module Solar Arrays (Ground Deployable) Descent Ascent Propellant Propellant Crew Module Ascent Propellant 4 D-20-13184_HLS_Releaseble

  5. Take a Look Inside: HLS Crew Module Androgynous Docking Adapter Primary Flight Station Translates for Microgravity Docking Operations Optical Windows for Landing and Docking Operations Operations Section for Dynamic Events and EVAs Dust Barrier with Two Times: Integral Don/Doff Stands Between Habitat and Operations Caution and Alarm System “Dust Free” Habitat Section for Meals, Flight Windows Flight Windows Sleep, and Hygiene EVA Hatch Habitat Waste and Flight Stations (Landing Position) Hygiene Compartment Multi-use Filtration, Depress, and Commode Dust Mitigation System Egress Well with Sample Upper Cot Container and EVA Tool Storage Stowage Under Cot Habitat General Space (HGS) Ducting and Replaceable ECLSS Consumables Under Floor Crew Seating and Table – Deploys as Lower Cot Gallery 5 D-20-13184_HLS_Releaseble

  6. Program Schedule CY 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Demo Initial Demo(s) Sustainable Demo(s) Sustainable Mission Continuation Refueling and Review Milestones Reuse CBR CDR On-Dock KSC Demo(s) or Initial Services 2024 HLS Base CLIN Option A Mission Acquisition/ On-Dock KSC Negotiation 2026 HLS Option B Procurement Strategy 2028 HLS Acquisition/ DDT&E (ATP  Launch Readiness) Negotiation Surface Suit DDT&E (ATP  Launch Readiness) 6 D-20-13184_HLS_Releaseble

  7. Dynetics Human Lander Team: Nationwide, Diverse, Experienced Supplier Base Denver, CO Cleveland, OH Hanover, NH  Maxar (HQ)  NASA GRC  Creare Boston, MA Madison, WI  Paragon Fremont, OH  Draper (HQ)  Sierra Nevada  Sierra Nevada Pittsburgh, PA  Sierra Lobo  ULA (HQ) Cincinnati, OH  Astrobotic Fredirica, DE  L-3 Harris  ILC Dover (HQ) Friday Harbor, WA  SEE Washington, DC  All Points  Osare Space Sparks, NV  SEE (HQ)  Sierra Nevada (HQ) Hampton, VA  Bionetics (HQ)  NASA LaRC Palo Alto, CA  Maxar Huntsville, AL  NASA ARC  All Points  Dynetics (HQ) Pasadena, CA  APT Research  JBS Solutions  Ecliptic  Cepeda  Sierra Nevada  NASA JPL  ATA Engineering  Victory Solutions San Diego, CA  DCI  NASA MSFC Houston, TX  ATA Engineering (HQ)  Draper  All Points Decatur, AL  Craig Tech  Dynetics Cape Canaveral , FL  Draper Tucson, AZ  ULA  All Points (HQ)  ILC Dover  Paragon SDC (HQ) Iuka, MS  APT Research  Oceaneering  Dynetics  Bionetics  Paragon SDC Turin, Italy Tuskegee, AL  Craig Tech (HQ)  Sierra Nevada  NASA KSC  NASA JSC  Tuskegee Univ.  TASI HLS work will take place in 17 states and Italy 7 D-20-13184_HLS_Releaseble

  8. Other Major Dynetics Space Programs: Core Stage Pathfinder and Universal Stage Adapter Core Stage Pathfinder Universal Stage Adapter (USA) 8 D-20-13184_HLS_Releaseble

  9. Other Major Dynetics Space Programs: MiCO 2 and LAMS Innovative solutions to power Laser Air Monitor human exploration, furthering System (LAMS) the deep space mission (On the First Orion Crew Flight to the Moon) Mini Carbon dioxide (MiCO 2 ) Scrubber 9 D-20-13184_HLS_Releaseble

  10. Human Landing System (HLS) 2020 10 10 D-20-13184_HLS_Releaseble

Recommend


More recommend