Hit the Highways November 13 th Bus Tour A Special Thanks to our Sponsoring Partners 2 The highway system Statewide Quick Facts: 140,000 mile of public roads, 10,000 state highways 4 th largest in the nation 837 miles of city


  1. Hit the Highways November 13 th Bus Tour

  2. A Special Thanks to our Sponsoring Partners 2

  3. The highway system • Statewide Quick Facts: – 140,000 mile of public roads, 10,000 state highways – 4 th largest in the nation – 837 miles of city connecting links • Regional Quick Facts: – 3,958 miles of state highway in KDOT District 4 3

  4. District 4 17 counties Population: 265,754 Daily Vehicle Miles Traveled in 2015: 8,671,394 - 10.10% Total Miles of Roads, Streets & Highways: 20,240 4

  5. District 4 Major Traffic Concerns • Increased Truck Traffic • Safety Concerns • Economic Development Needs 5

  6. Bridge Conditions • Two Classifications – Structurally Deficient – Functionally Obsolete 6

  7. Bridge Conditions Source: KDOT Data submitted to FHWA 7

  8. Bridge Conditions * Source KDOT’s Performance Measures website 8

  9. Bridge Conditions * Source KDOT’s Performance Measures website 9

  10. District 4 Truck Traffic Trends 10

  11. Pavement Analysis What are they measuring? 1. Ride 2. Joint Distress or Cracking 3. Faulting or Rutting 11

  12. Pavement Analysis • Level 1-Denotes segments are smooth and exhibit few if any surface defects. Pavement segments in this category do not require corrective action, however it may be appropriate to perform preventative maintenance to prolong this good condition. • Level 2-Denotes segments that appear to require at least routine maintenance to address roughness or to correct moderate surface defects. • Level 3-Denotes segments that appeared to require a rehabilitative action beyond routine maintenance at the time of the survey 12

  13. Right Action/Right Time 13

  14. Do we really need to worry about dropping in preservation funds? Pavement Condition 2016 – Level 1 Pavement Condition 2017 – Level 2 14

  15. Modernization/Expansion Project Delays as announced 4/2016 US-69 Project reprogrammed back into T-WORKS 15

  16. US-69 Arma Connection Project Delayed Project Goals: Creates a 4-lane expressway connection around the city of Arma safety concerns truck traffic concerns 16

  17. US-69 Project Delayed 17

  18. Do we really need to worry about dropping in preservation funds? Pavement Condition 2016 – Level 1 Pavement Condition 2017 – Level 2 18

  19. Practical Improvements • A practical improvement – A recognition that needs will always outpace resources – Gives engineers and others the flexibility to use lower-cost alternatives to the full-scale complement of improvements that have been standard. Sometimes includes Narrowing project footprint Identifying less-expensive means 19

  20. US-400 Passing Lanes 20

  21. Do we really need to worry about dropping in preservation funds? Pavement Condition 2016 – Level 1/2 Pavement Condition 2017 – Level 2 21

  22. Other Highway Needs: Shoulders 22

  23. Types of Projects & Preservation Spending Breakdown • Resurfacing $220m - $250m/year – Typical project scopes include thinner overlays, chip seals and patching of existing roads. Would improve 1200 – 1500 miles/year. Includes interstate and non-interstate routes. • Bridge Replacements $50m - $75m/year – Would replace deteriorated bridges. Number of bridges would vary depending on sizes. • Bridge Repairs $15m - $20m/year – Typical project scope includes deck replacement/repair, structural repair, repainting of existing bridge structures. Number of bridges would vary depending on size and magnitude of repairs needed. • Heavy Preservation $50m - $90m/year – Typical project scopes would include full depth pavement reconstruction/replacement or significant rehab of the existing pavement section. 23

  24. Where we are today $450-$500m in sales tax receipts transferred each fiscal year – the entirety that can be transferred is being transferred More than $500m in delayed projects Month to month lettings “ the agency will make decisions on a month to month basis.” – Wichita Eagle Article 11/14/16 Inability to respond to emerging or urgent infrastructure needs 24

  25. Preservation Spending Pre-17 Session 17 added FY 11 FY 12 FY 13 FY 14 FY 17 FY 18 FY 15 FY 16 FY 19 25

  26. How is KDOT coping? A look at Revenues & Expenditures FY 18 Revenues fall below existing payouts and necessary preservation 26

  27. Do we really need to worry about dropping in preservation funds? For each $1 spent during the first 40% of pavement quality will cost $4-$5 if delayed until the pavement loses 80% of it’s original quality. http://www.dennis.polhill.info/archives/category/pavement-management 27

  28. Population and Growth Opportunities Percentage of Population changes since 2010 Source: institute for policy & social research, The University of Kansas, data from U.S. Census Bureau Population Estimates, Vintage 2016 28