DEVELOPING A NEW HIGH- GRADE GOLD DISTRICT METALS INVESTORS FORUM | MARCH 3, 2018
Forwarding Looking Statements Certain information regarding Erdene ("the Company") mineralized zone has an interpreted dip of 45 degrees Person for the purpose of National Instrument 43-101. contained herein may constitute forward-looking therefore true width is close to reported drill hole The Mineral Resource estimates for Altan Nar have been statements within the meaning of applicable securities intervals. All holes in Union North were drilled compiled under the supervision of Mr. Jeremy Clark who laws. Forward-looking statements may include estimates, perpendicular to the trend of mineralization. is a full-time employee of RPM and a Member of the plans, expectations, opinions, forecasts, projections, Australian Institute of Geoscientists. Mr. Clark has guidance or other statements that are not statements of TECHNICAL REPORTS sufficient experience that is relevant to the style of fact. Although the Company believes that the mineralisation and type of deposit under consideration For the Bayan Khundii project, please refer to the expectations reflected in such forward-looking and to the activity that he has undertaken to qualify as a Company’s National Instrument 43-101 technical report, statements are reasonable, it can give no assurance that available on the Company’s profile at www.sedar.com. Qualified Person as defined in the CIM Standards of such expectations will prove to have been correct. The Disclosure. There is no resource estimate included in the report. Company cautions that actual performance will be affected by a number of factors, many of which are For the Altan Nar project, please refer to the NI 43-101 beyond the Company's control, and that future events SAMPLE PROTOCOL compliant mineral resource report for Altan Nar, dated and results may vary substantially from what the All samples have been assayed at SGS Laboratory in March 24, 2015, entitled “Altan Nar Gold Project, Company currently foresees. Factors that could cause Ulaanbaatar, Mongolia. In addition to internal checks by National Instrument 43-101 Mineral Resource Technical actual results to differ materially from those in forward- SGS Laboratory, the Company incorporates a QA/QC Report”, Company’s available on the profile at looking statements include market prices, exploitation sample protocol utilizing prepared standards and blanks. www.sedar.com, as well as the Company’s news release and exploration results, continued availability of capital Erdene’s sampling protocol for drill core consisted of dated March 31, 2015, for further details on the Altan Nar and financing and general economic, market or business collection of samples over 1 metre or 2 metre intervals mineral resource estimate. All Mineral Resources for conditions. (depending on the lithology and style of mineralization) Altan Nar reported in this presentation represent over the entire length of the drill hole, excluding minor estimates as at 19th February, 2015. RungePincock- The Company's forward-looking statements are post-mineral lithologies and un-mineralized granitoids. Minarco (“RPM”) have considered the costs, recoveries expressly qualified in their entirety by this cautionary Sample intervals were based on meterage, not and dilutions expected by comparing with other similar statement. The information contained herein is stated as geological controls or mineralization. All drill core was cut deposits in the region and adjusted these by considering of the current date and subject to change after that date. in half with a diamond saw, with half of the core placed in the location of the Project and the deposit characteristics. Unless otherwise indicated, all dollar values herein sample bags and the remaining half securely retained in Mineral Resource grades are reported in accordance core boxes at Erdene’s Bayan Khundii exploration camp. are in C$. with the CIM Standards. All samples were organized into batches of 20 samples Mineral Resource Estimates for Altan Nar are reported including a commercially prepared standard and blank. DRILLHOLE INTERVALS on a dry in-situ basis. Gold equivalent (“AuEq”) values Sample batches were periodically shipped directly to Reported intervals in this presentation are not true width. are used in an effort to express the combined value of SGS in Ulaanbaatar via Erdene’s logistical contractor, At this time, there is insufficient data with respect to the gold, silver, lead and zinc as a percentage of gold, and Monrud Co. Ltd. shape of the mineralized system to calculate true are provided for illustrative purposes only. No orientations in space. At the Company’s Bayan Khundii All metallurgical testing and analysis was carried out by allowances have been made for recovery losses that project, reported intervals represent drill intersection Blue Coast Research Ltd. at their facility in Parksville, may occur should mining eventually result. Calculations widths from holes drilled at a 45 to 60 degree angle British Columbia. use metal prices of US $1,200/oz gold, $18/oz silver, and (occasionally 90 degree angle). The Bayan Khundii $0.90/lb for lead and zinc. mineralization is moderately dipping (approximately 40 to 50 degrees), approximately perpendicular to the drill hole QUALIFIED PERSONS angle. Michael MacDonald, P.Geo. (Nova Scotia), Vice Reported drill hole intervals at the Company’s Altan Nar President of Exploration for Erdene, is the Qualified project represent drill intersection widths with most holes Person as that term is defined in National Instrument drilled at a 45 degree angle. For the Discovery Zone, the 43-101 and has reviewed and approved the technical information contained in this presentation. orientation of the mineralization is near vertical and Results for the metallurgical test programs summarized therefore true width is interpreted to be approximately in this release were reviewed and approved by Andrew 70% of the reported intervals. For Union North the Kelly, P.Eng., of Blue Coast Research Ltd., a Qualified TSX:ERD | www.erdene.com | 2
Erdene at a Glance High-Grade, District-Scale, Experienced Team High-grade, near-surface , 100%-owned gold projects within an expanding mining region within an emerging mining region. The new Khundii Gold District provides exceptional discovery potential beyond our core projects. We are the longest-standing foreign exploration company in Mongolia with a Mongolia-focused team and a strong social license to operate. TSX:ERD | www.erdene.com | 3
Emerging Gold District in Southwest Mongolia New Mining District Near Chinese Border A Decade of Methodical, Regional Exploration The Khundii Gold District in the Edren Terrane for Epithermal Multiple Near-Surface Discoveries Gold/Porphyry Copper in Unexplored Area Since 2010 TSX:ERD | www.erdene.com | 4
Bayan Mongolian word for Rich | Khundii Mongolian word for Valley Looking Northeast Through Striker Zone (2 kilometres)
Bayan Khundii Gold Project Snapshot: 234 Holes with >18% Intersecting >30g/t Au Discovered: 2015 Total Drilling: 38,070 m No. of Holes: 234 Section Line 162 m (60° dip) Avg. Depth: (see next slide) System Size: 1.5 x 0.4 km Holes with 18% > 1 oz / t Au: Met Recovery: 92 - 99% TSX:ERD | www.erdene.com | 6
Bayan Khundii Gold Project Multiple High-Grade Zones With Lower Grade Halo NE Zone North Midfield 1.4 km Midfield Controlling Striker Structures 3-D grade model underlying geology; West Striker multitude of NW striking-SW dipping high grade low sulfidation epithermal quartz-adularia zones surrounded by disseminated halo of gold with hematite > 0.3 g/t Au and speculurite in veinlets within > 1.0 g/t Au intensely altered Devonian volcanics > 2.5 g/t Au Tilted View - Looking Northeast TSX:ERD | www.erdene.com | 7
Bayan Khundii Gold Project Structural Targeting of Ultra High-Grade Feeder Zones • 4DGeo Q3-Q4 Structural Location of Study and Interpretation Breach North Midfield, 2200 g/t Au Major Fault Major (Potential Fault- Feeder poten Zone) Hanging Wall tial feede r zone Relay ramp geometry and kinematics Source: Dr. Armelle Klopenberg, 4DGeo, Oct 2017, Structural framework analysis Bayan Khundii and Altan Nar assets, Mongolia TSX:ERD | www.erdene.com | 8
Bayan Khundii Gold Project Striker Zone Cross Section – Continuous High Grade Core Striker Zone continues down dip >250m High-grade core of Striker exposed at surface; metres and open; adjacent Gold Hill near continues down dip >100 metres; highlights of 1m assays within 1 g/t Au shell surface; 0.3g/t Au shell Gold Hill BKD-44: 93.1g/t BKD-1: 187g/t BKD-09: 79.4g/t & 38.9g/t BKD-17: 80g/t BKD-84: 19.7g/t, 16.1 & 101g/t Midfield BKD-17: 37.5g/t, 11.9 & 81.7g/t BKD-78: 23g/t BKD-129: 18.8g/t TSX:ERD | www.erdene.com | 9
Bayan Khundii Gold Project Midfield Zone - Hanging Wall Cross-Section Midfield Zone, 230 metres in length; 0.3g/t High-grade zones begin 50 m below surface, within 1g/t Au shell; projected 100m down dip; shell with >10g/t core quartz adularia limited drilling of high grade zones, zone comes within 20m of surface BKD-98: 20g/t BKD-98: 129g/t BKD-98: 69.4g/t BKD-98: 57.5g/t BKD-230: 15.9g/t BKD-230: 48.6g/t BKD-230: 45.8g/t BKD-99: 69.7g/t BKD-99: 314g/t TSX:ERD | www.erdene.com | 10
Recommend
More recommend