fra 70 14 54 i 70 i 71 project phase 2e
play

FRA-70-14.54 I-70/I-71 Project: Phase 2E Presented By: January 23, - PowerPoint PPT Presentation

FRA-70-14.54 I-70/I-71 Project: Phase 2E Presented By: January 23, 2019 Agenda Overview Cooperation between Contractors Maintenance of Traffic Structures Utilities - Mooberry Environmental Commitments Columbus Crossroads


  1. FRA-70-14.54 I-70/I-71 Project: Phase 2E Presented By: January 23, 2019

  2. Agenda  Overview  Cooperation between Contractors  Maintenance of Traffic  Structures  Utilities - Mooberry  Environmental Commitments

  3. Columbus Crossroads I-70/71

  4. Current I-70/71 Eastbound 900 1500 1700 • I-70 has 1 continuous through lane • I-71 makes 2 lane changes

  5. 70/71 EB After Phase 2E 900 1500 1700 • I-70 will have 2 continuous through lanes • I-71 will make 1 lane change

  6. 70/71 After Phase 4R • I-70 will have 2 continuous through lanes • I-71 will have 2 continuous through lanes • Ramp traffic departs before the overlap

  7. Coordination with Other Projects 2G Coordination N • No work on I-70W until May 2019 3B Coordination • Minimal due to timing 4R Coordination • New through lane on 70E • Livingston C 3 rd St bridge work • • Communications/ITS Livingston C

  8. Communication with Stakeholders N COTA Nationwide Children’s Hospital

  9. City of Columbus • New ramp 70E to Parsons 70E to 18 th St ramp closes • New ramp Fulton to 70E • • Fulton 1 way from High St • New landscaping on Moobery and Parsons

  10. Downtown Street Circulation Mound WB, Fulton EB and New Ramps

  11. MOT During Phase 2E Phase 1 • Main Street on ramp to WB I-70 will remain closed 4 th & Fulton intersection to close for 2 weeks • • New ramp from 70 E to Parsons completed

  12. MOT During Phase 2E Livingston C • Open 70 E ramp to Parsons • Close Third St ramp to 70 E • Bridge work moved to later phase

  13. MOT During Phase 2E Phase 2 • 60 day closure of Parsons

  14. MOT During Phase 2E Phase 3 • Mooberry Street construction begins - one-way traffic for 60 days

  15. MOT During Phase 2E Phase 4 • Shift EB I-70 traffic to new EB lanes • Construction of Fulton ramp to EB I-70

  16. MOT During Phase 2E Phase 5 • Open Fulton ramp to EB I-70 • Make Fulton 1-way EB from High St • Finish freeway construction on east side of interchange Keeping ramps open • 71S to 70E • 70W to 71N

  17. Major Structures Overview – Retaining Walls

  18. Major Structures Overview – Retaining Walls I-11 - Replace wood lagging with precast concrete

  19. Major Structures Overview – Retaining Walls MSE Walls

  20. Major Structures Overview – Retaining Walls CIP walls with a precast alternate

  21. Major Structures Overview – Retaining Walls CIP walls without a precast alternate I-13-2 Needed a crashworthy wall at Mooberry, and the moment slab would have complicated access to utilities.

  22. Major Structures Overview - Bridges

  23. Major Structures – Lowest level

  24. Major Structures – Lowest Level FRA-70-14.98 – Built for traffic in a future phase

  25. Major Structures – “Tunnels” FRA-70-14.98 – Built for traffic in a future phase

  26. Major Structures – Lowest Level FRA-70-14.79 – Partially built due to sight distance underneath

  27. Major Structures – “Squiggle Bridge” FRA-70-14.61 – Complex Structure • Large skew • Haunched profile • Curved ends • Staggered cross frames Approach slab and rear abutment were constructed in a previous phase.

  28. MAJOR STRUCTURES I-70 over Parsons Avenue FRA-70-14.93 L&R – WB deck to be built in a future phase.

  29. BRIDGE ENHANCEMENTS I-70 over Parsons Avenue Parsons Ave. Bridge

  30. ITS – Both ODOT FMS and Columbus CTSS Columbus CTSS N • Down time is only allowed a few hours one day per month • Currently Columbus is booking ahead 4 months Temporary A and Temporary B • Temporary A is the result of the Livingston C project being behind schedule. Coordinate with Livingston C project. • Temporary B is long term temporary after PID 105322 Livingston C Pre-emption to be non-performed

  31. Drainage Upcoming Addenda Ref 168 – 60” will be expanded to other methods besides jack N and bore with steel encasement A pay item reference for Item 503 will be added for shoring bore pits Catch basin will be specified as cast in place.

  32. Environmental Commitments N Near East Side NHD Former Ohio Asylum for the Blind (Columbus Health Center) Hanna Neil House Delmonte Apartments S. High Commercial NHD St. John’s Church 70 70

  33. Environmental Commitments Construction Noise Mitigation N See General Notes for requirements, including provisions necessary for weekend and nighttime operations 70

  34. Environmental Commitments N NCH Research 2 Building NCH Orthopedic Building 70 70

  35. Tree Removal for 3B N Construction Debris Removed

  36. Questions?