final presentation
play

Final presentation San Aziz 2018-05-24 About course Production - PowerPoint PPT Presentation

Final presentation San Aziz 2018-05-24 About course Production development. Maintenance development. Quality development. 2 About projects Implementation of 5s. Improvement of material flow. Automation of production


  1. Final presentation San Aziz 2018-05-24

  2. About course ● Production development. ● Maintenance development. ● Quality development. 2

  3. About projects ● Implementation of 5s. ● Improvement of material flow. ● Automation of production process. ● Placement of robots. ● Improvement of production capacity with time studies. 3

  4. Industrial companies ● Volvo Powertrain in Köping. ● GKN Driveline in Köping. ● Alfa Laval in Eskilstuna. 4

  5. Presentations ● 8 presentations. ● All presentations in English. ● All group members presenting. ● 10 minutes presentation maximum. ● 5 minutes questions/feedback. 5

  6. Projects ● Group 1 – Implementation of 5s at Volvo Powertrain in Köping. ● Group 2 – Improvement of material flow at GKN Driveline in Köping. ● Group 3 – Automation of bowl disc handling at Alfa Laval in Eskilstuna. ● Group 4 – Time studies at Volvo Powertrain in Köping. ● Group 5 – Improvement of material flow at GKN Driveline in Köping. ● Group 6 –Pre-study for implementation of collaborative robot at Volvo Powertrain in Köping. ● Group 7 – Improvement of material flow at GKN Driveline in Köping. ● Group 8 – Improvement ergonomics in production line at GKN Driveline in Köping. 6

Recommend


More recommend