Facility Expansion Project
Spaces Needs Exhibit Space for the 650-700 sq. ft. Walker Collection Archival Storage 325 sq. ft. Walker Collection Storage 500 sq. ft. Non-Walker Collections 500 sq. ft. Storage Total 2, 025 sq. ft.
Options • Option 1 – Adding on to Prouty-Chew • Option 2 – Building a new facility at Rose Hill • Option 3 - Leasing/buying/building a space somewhere in Geneva
Option 3 • Existing Spaces – old DeSales High School, Trinity Church, Pinkie’s, Dove Block, former Stomping Grounds building • Lots within the town and city – Old Gilotti Gas Station and corner of North and Exchange Streets • Leasing – old Tops building and office park on County Rd. 6
Option 3 • After careful consideration, Option 3 is no longer a viable option. – Existing spaces • Spaces were too big or too small • High costs (purchase price, utilities, and retro-fitting a building) – Town and City Lots • Town lots proved to be too expensive • City lots were unavailable – Leasing • Concerns about not being in control of the building and its maintenance • Concerns about the lease not being renewed.
Option 1 - Prouty-Chew • Installing an elevator that would go from the sub- basement to the 2 nd floor • Building on top of the Hucker Gallery and Archival Vault to create additional space for collections storage and exhibits • Renovating bathrooms • Modifying the outside entrance to the Hucker Gallery.
Option 1 - Costs Low High Elevator $247,5000 $297,000 Renovations and $821,000 $985,300 Additions Bathrooms $39,600 $47,500 New Mechanical $368,400 $442,000 Systems Total Costs $1,476,600 $1,772,000
Option 2- Rose Hill • Building a new facility at Rose Hill where the barn currently stands • The Historical Society’s headquarters would still be at Prouty-Chew • Exhibit, collection storage and program space along with a small kitchen and bathrooms • Costs - $841,600 - $1,000,900 • However…..
Work must also be done at Prouty-Chew • Renovating the Low High bathrooms Bathrooms $35,000 $42,000 Accessible $27,100 $32,500 • Creating an accessible Entrance to entrance to the Hucker Hucker Gallery Gallery LULA lift $183,500 $220,200 • Installing a LULA Total $245,600 $294,700 (Limited Use Limited Access) lift from the Hucker Gallery to the First Floor
Option 2 - Costs Low High New Building at Rose Hill $841,600 $1,009,900 Work to be done at Prouty- $245,600 $ 294,700 Chew Total $1,087,200 $1,304,600
Costs for Option 1 and Option 2 Low High Option 1 – Adding on to $1,475,600 $1,772,000 Prouty – Chew Option 2 – Building a new $1,087,200 $1,304,600 facility at Rose Hill and work done at Prouty-Chew
Recommend