Environmental Baseline Study Project Description (EBS) Identifying the Impacts Impact Assessment & Analysis Rapid Impact Ecological Capability Eco-Mapping Assessment Matrix Evaluation Conclusion Environmental Management Plan
Ecological Capability Evaluation for Step 1 Agricultural Land use Rapid Impact Impact Analysis Step 2 This Paper Assessment Matrix (RIAM) Step 3 Eco-Mapping Conclusion
Slope Zone Soil Texture Class (%) Loam 0-8 2 Clay-Loam Suitable Sandy-Clay-Loam Silty-Loam 0-8 3 Sandy-Loam Semi-Suitable Loam 8-15 4 Clay-Loam Sandy-Loam > 15 5 Any kind of Soil Unsuitable
Impacts in Suitable Zones Impacts in Semi-Suitable Zones Construction Operation Construction Operation Phase Phase Phase Phase Environmental Negative (%) No Change (%) Positive (%) Negative (%) No Change (%) Positive (%) Negative (%) No Change (%) Positive (%) Negative (%) No Change (%) Positive (%) Factor 11.1 22.2 0 22.2 7.4 3.7 11.1 22.2 0 25.9 3.7 3.7 Physical/Chemical Biological/Ecological 18.5 7.4 0 22.2 3.7 0 22.2 3.7 0 25.9 0 0 Sociological/Cultural 0 18.5 7.4 11.1 3.7 11.1 0 18.5 7.4 11.1 3.7 11.1 3.7 3.7 7.4 7.4 0 7.4 0 7.4 7.4 7.4 0 7.4 Economic/Operational 33.3 51.8 14.8 62.9 14.8 22.2 33.3 51.8 14.8 70.4 7.4 22.2 Total
Scoring Criteria -1 -2 -3 -4 -5 0 zone 1 zone 2 Scoring Criteria Ground water quality -1 -2 -3 -4 -5 Soil Erosion 0 zone 3 zone 1 zone 4 zone 2 zone 5 Scoring Criteria zone 3 -1 -2 -3 -4 -5 0 zone 6 Aras River quality zone 1 zone 4 zone 7 Scoring Criteria -1 -2 -3 -4 -5 0 zone 2 zone 5 Sensitive Habitats zone 1 zone 3 zone 6 zone 2 zone 4 zone 7 Scoring Criteria zone 3 -1 -2 -3 -4 -5 0 zone 5 Vegetation Cover zone 1 zone 4 zone 6 zone 2 zone 5 zone 3 zone 7 zone 6 zone 4 zone 7 zone 5 zone 6 zone 7
Zone Result -18 1 √ -16 -14 2 √ Scoring Criteria -12 Except for a -10 part -8 3 Omitted -6 4 √ -4 -2 Except for a part 0 zone 1 zone 2 zone 3 zone 4 zone 5 zone 6 zone 7 5 Omitted 6 Omitted 7 Omitted
Recommend
More recommend