Duvauchelle Wastewater Project Overview of Scheme Options - PowerPoint PPT Presentation

Duvauchelle Wastewater Project Overview of Scheme Options Presentation to the Ng i T ahu Parties Thursday 20 th S eptember 2018 Consent History Plant commissioned in 1985 Current short term consent granted 31 J anuary 2011


  1. Duvauchelle Wastewater Project Overview of Scheme Options Presentation to the Ng ā i T ahu Parties Thursday 20 th S eptember 2018

  2. Consent History • Plant commissioned in 1985 • Current “short term” consent granted 31 J anuary 2011 • Expires 28 J anuary 2023 • Working Party set up in 2011 • M et 14 times – now coming towards a solution • Consent conditions - milestones • Working Party to report on Options by 31 October 2016 (done) • Working Party to report on “referred” option by 31 October 2018 (done) • Report on proposed implementation program, consenting, construction and operation by 31 October 2020

  3. Options Considered • Continued Harbour Discharge • Discharge to Land (reuse) • 5 possible land application sites considered • Criteria - land slope < 15 degrees • Proximity to plant. • Site 1 and 3 best options • Storage of winter volume required Land discharge is technically feasible therefore harbour discharge will be very difficult to consent

  4. 13/ 12/ 2016 2

  5. 13/ 12/ 2016 Control (no irrigation) 440 mm/yr 825 mm/yr 1650 mm/yr Wastewater accelerates pasture growth 14 Dry matter production (t/ ha/ yr equiv.) 12 10 8 6 4 2 0 D control D 440 D 825 D 1650 A control A 825 4

  6. Native Tree Growth Trial using Duvauchelle Treated Wastewater Lincoln University October 2014 T o February 2018

  7. Golf Club and Show Grounds Irrigable Areas Drainage Operating Drainage Area (ha) Class Regime Good All year Good 5.0 Moderate S ummer + Moderate 2.5 shoulder only Poor S ummer only Poor 3.4 T otal assumed irrigable area 10.9 - Any land > 15 degrees is excluded

  8. Duvauchelle Wastewater S cheme Options

  9. Rough Order Capital Cost Estimate Option Rough Order Capital Cost Options 1 - 3 $4.0M - $5.0M Option 4 $3.3 - $4.2M

  10. Option 2 photomontage

  11. Option 4 Photomontage – Covered Vs Uncovered Pond

  12. Next Steps • Community Information meeting(s) • Further develop preferred option(s) and costs • Review implications of Akaroa bore injection work for Duvauchelle scheme • Report to Council for a decision on preferred option • Prepare and lodge consent application • Report on proposed implementation timeframe