School Committee Meeting Presentation November 21, 2017 DURFEE BMC H I G H S C H O O L
Project Timeline MSBA A FAS Meeting Schema mati tic Design July 27, 2017 January 3, 2018 November 21, 2017 Project Review Meeting Schematic Design with the MSBA Facilities (Module 4) submission Building ding Occup upancy ancy Assessment to the MSBA. Subcommittee September 2022 Prefer ferred Schematic Fall River INVITED Fall River INVITED MSBA Project Scope & Budget (PS&B) Conf. Into Eligibility ty Pe Period Const stru ruction on Phase Into Feasibi bility ty Study dy Study dy and Report January 2018 January 14, 2015 November 18, 2015 June 29, 2017 2019 - 2022 City y Vot ote e to Appro rove e MSBA Board of Directors MSBA Board of Directors Preferred Schematic Construction of new Pro roject ct Fundin nding voted to issue an voted to issue an Study & Report (PSR - building and renovation invitation to enter into invitation to enter into the Module 3) submitted to of existing athletic March 2018 the Eligibility Period Feasibility Study Phase the MSBA building 2013 2014 2015 2016 2018 2019 2022 2017 MSBA Board Vote to MSBA “Senior Study” Approve PS&B Agreement Site te Re Review February 2018 Design Phase 2014 MSBA BA Board rd Appr proves s Summer 2018 - 2019 Pref eferred erred Schema ematic tic MSBA conducts site Design Development walkthrough of existing Solut ution on (DD) thru Construction BMC Durfee site. Feasibi bility ty Study y (PDP) Documents (CD) Phase SOI #2 SOI #1 August 16, 2017 April 20, 2017 April 9, 2014 2013 Massachusetts School Feasibility Study report Building Authority (Module 3) submitted to Fall River submitted a Fall River submitted a (MSBA) Board of the Massachusetts Statement of Interest to Statement of Interest to Directors unanimously School Building the MSBA. the MSBA. – NOT INVITED approved Preferred Authority (MSBA). Schematic Solution. BMC DURFEE H I G H S C H O O L
Site Selection Evaluation Industrial Park Site 22 Acres Site T oo Small ll • (not enough buildable area) Environ onme mental al Contam amin inat ation ion • Addition onal al Cost to Purchas ase • BMC Durfee High School 63.86 Acres Zoning Restric rictions ons • Abutting Propertie ies • (NOT conducive to a school environment) Anawan Mills Site 6.1 Acres Duro Mills Site 10 Lewiston Street 16 Acres (Fall River DPW) 5.6 Acres BMC DURFEE H I G H S C H O O L
Summary of Options Studied – Existing Durfee Site OPTION 1A OPTION 1C OPTION 2A OPTION 1E OPTION 1B OPTION 1D OPTION 2B BMC DURFEE RENOVATION & NEW CONSTRUCTION NEW CONSTRUCTION H I G H S C H O O L
Schematic Design Phase OPTION 1E Since the Last School Committee presentation….. Building ding Prog ogramm rammin ing g Meetin ings gs with h User Grou oups ps • Science ence (gener neral l educa catio tion, n, obser ervat vator ory, , plan aneta etariu rium) m) Administr ministratio ion/Se /Secu curit ity • • Healt lth Assis isting ting Guida idance nce • • Over Envir vironment mental al Scienc ence Nurse • • 75 Engin ineerin eering Tech chnolo logy Special cial Educat catio ion • • Ear arly ly Educa catio tion & Car are Athle thletics tics / Phys ysical ical Educat catio ion • • Marketi keting Fine e Arts ts / Performin ming Arts ts • • Librar ary y Media ia Specialist cialist Music ic • • Genera eral l classrooms ms Constr truction ction Craf aft • • Student ent/St /Staff aff Colla llaborat atio ion spaces ces Culin linary y Arts ts / Trad adewind ewinds • • Meetings ROTC Visual l Design Commu munica icatio ions • • Custo todia ial l / Main intena enance ce Cosmeto metolo logy • • FRED D TV • BMC DURFEE H I G H S C H O O L
Schematic Design Phase OPTION 1E Since the Last School Committee Presentation….. Mechanical ical / Electrical rical / Plumbing / FP Coordin inat ation ion Meetings with Dist strict rict • & City Person onnel Technolog ogy y & Security ity Coordin inati ation on Meetings s with Distric rict & City Person onnel • Fall l River r Fire and Police ce Coordin inati ation on Meetings • Over Utility ity Coordin inati ation on meeting with Fall l River r Water r / Sewer Depar artme ment • e spaces 75 Communit ity Forums • Food Service Meetings with Whitson’s • Bells Committ ittee ee Meetings • Observator atory / Histor oric ic Telescop cope Meeting • Sub Sub-surfa face e Investig igat ation ion Coordin inat ation ion Meetings • Meetings Fall l River r Offic ice of Economi omic c Developm lopmen ent Presentatio ation • Peoples s Incorpor orat ated ed Meeting relat ated ed to Early rly Education ion & Care • BMC DURFEE H I G H S C H O O L
North Arrow SITE PLAN Spencer Borden Elementary School Performing Arts / Music Student Dining / Culinary 3-story Atrium Secondary Entry Lobby Driscoll Arena Elsbree Street BMC DURFEE H I G H S C H O O L
CONCEPTUAL 3D RENDERING ELSBREE STREET LOOKING SOUTH TOWARD MAIN ENTRANCE New core academic building along Elsbree Street with a • pedestrian friendly entry plaza. Identifiable, inviting, secure entrance. • Central Organizing Atrium – Celebrating the History of Fall • River and BMC Durfee High School Use of low maintenance, durable materials (Brick, Stone, • Fiberglass) Architectural cues from Old Durfee on Rock Street • Classical design elements – symmetrical organization, • bell tower, observatory tower (historic telescope), arched windows, hipped roof, etc. Building on plinth • Re-use and integration of historic bells, clock faces, • granite benches, pavers, and restored clavier. BMC DURFEE H I G H S C H O O L
CONCEPTUAL 3D RENDERING ELSBREE STREET LOOKING NORTH TOWARD MAIN ENTRANCE BMC DURFEE H I G H S C H O O L
MILL BLDG. PRECEDENTS SCHEMATIC INTERIOR PERSPECTIVES Examples…. Flint Cotton Mill Borden Mills American Printworks Sanford Spinning Company BMC DURFEE H I G H S C H O O L
ATRIUM SCHEMATIC INTERIOR PERSPECTIVES BMC DURFEE H I G H S C H O O L
ATRIUM SCHEMATIC INTERIOR PERSPECTIVES BMC DURFEE H I G H S C H O O L
ATRIUM SCHEMATIC INTERIOR PERSPECTIVES BMC DURFEE H I G H S C H O O L
SECONDARY LOBBY SCHEMATIC INTERIOR PERSPECTIVES BMC DURFEE H I G H S C H O O L
Propos posed ed BMC BMC Durfee Hi Durfee High Sc gh School hool 2,570 students 501,330 Gross Square Footage Approximately Total Project Cost $260 Million Approximately $94-99 Million City Portion BMC DURFEE H I G H S C H O O L