dr ops m maint nt e na nanc nce int nt e gr it y
play

DR OPS M MAINT NT E NA NANC NCE INT NT E GR IT Y Angus - PowerPoint PPT Presentation

DR OPS M MAINT NT E NA NANC NCE INT NT E GR IT Y Angus Munro HSSE Team Lead (Well Engineering & CW I) Brunei Shell Petroleum Company RESTRICTED Brunei Shell P etroleum Company RESTRICTED May 2013 2 MAINT E E N NANCE E


  1. DR OPS M MAINT NT E NA NANC NCE INT NT E GR IT Y Angus Munro HSSE Team Lead (Well Engineering & CW I) Brunei Shell Petroleum Company RESTRICTED

  2. Brunei Shell P etroleum Company RESTRICTED May 2013 2

  3. MAINT E E N NANCE E R E E Q QUIR E E D T D T O PR E E VE V E NT N D DR OPPE E D D OBJE E C CT S  Droppe pped d Obj bject I Incide dents – most freq equen ent H HPI i inciden ent in Wel ell E E ngineer eering past 5 y yea ears  2013 B BSP D Droppe pped O d Obj bjects Incide dents – 16 incidents, 13 in derrick (TDS bolts = 6, Dolly = 3)  Drop opped O Object t preventi tion on is top top p person onal safety ty p prior ority ty f for or 2 2014 R equired A Actions fo for 2014 2014 – to S to Stop top th the Drop ops 1. 1. E mbed D Drop ops R R ed Z Zon one & No G o Go o Zon one Pol olicy – active Red Zone management “Red Zone Wardens” 2. 2. Chal allenge ge Y Y our M Mai aintenan ance S Schedu dule f for Drops ps P Plan an - replacement schedule for all secondary fastenings, nuts, & bolts Droppe pped O d Obj bjects - E quipment F Failure ( (2009 2009 - 2013) 2013) Droppe pped O d Obj bjects - Categories ( (2009 2009 - 2013) 2013) 84 D 84 Drops 4% 12% 3% 6% Inc ncident nts 42% 15% 22% 58% DI = design integrity Equipment Failure TDS 11% OI = operating integrity Equipment Operations Pipe Racker MI = maintenance integrity Lifting & Hoisting Dolly Track 27% Hand Tools Finger Board Slip, Trip or Fall Brunei Shell P etroleum Company 3 Elevator

Recommend


More recommend