Douglas MacArthur New Build Update Meeting June 24, 2020 DMAG Meeting #8 www.acps.k12.va.us
AGENDA Design Update: • Review of Community and Advisory Group Feedback • Next Steps www.acps.k12.va.us 2
Traffic 1. Traffic light at the entrance to the new parking lot on the west end of the site 2. Traffic study update 3. Management of drop-off www.acps.k12.va.us 3
Site Diagrams • Traffic/ Site Circulation • Drop-off sequence www.acps.k12.va.us www.acps.k12.va.us 4
Exterior Site Design 1. Exterior hardscape paved play (basketball court) 2. Sidewalk width 3. Access to the site and the trails 4. Front lawn 5. Landscaping 6. Courtyard impacts and benefits www.acps.k12.va.us 5 1.
Site Diagrams • Traffic/ Site Circulation • Pedestrian Paths Existing Pedestrian Paths New Pedestrian Paths www.acps.k12.va.us www.acps.k12.va.us 6
Site Diagrams • Landscape/ Play Existing Landscape & Trees New Landscape & Trees www.acps.k12.va.us www.acps.k12.va.us 7
Site Diagrams • Landscape/ Play Existing New www.acps.k12.va.us www.acps.k12.va.us 8
Site Diagrams • Gathering Existing New www.acps.k12.va.us www.acps.k12.va.us 9
Site Diagrams • Landscape/ Play • Courtyard www.acps.k12.va.us www.acps.k12.va.us 10
Building Design 1. Change to 2 classroom bars - benefits and impacts 2. Material Palettes 3. Aesthetic of connection between the two classroom wings www.acps.k12.va.us 11
Site Diagrams • Footprint/ Siting Concept Submission April Prelim Site Plan Submission June Prelim Site Plan Submission • • • Adjacent to north property line Adjacent to north property line Adjacent to north property line • • • 3 ‘fingers’ footprint Courtyard footprint Courtyard footprint • • • Single center connection Bridge and Portal connection Portal/ East hall connection • • • No loop circulation Double loop circulation Single loop circulation • • Gym aligns with Janneys Gym aligns with Janneys www.acps.k12.va.us www.acps.k12.va.us 12
Material Palettes Palette A Total: 45 Palette A was the strong preference due to its natural tones and alignment with the neighborhood. Palette B Total: 22 Palette C Total: 19 www.acps.k12.va.us 13
Material Palette A • Color Palette • Community Feedback www.acps.k12.va.us www.acps.k12.va.us 14
Design Update • Massing/ Canopy • Fenestration www.acps.k12.va.us www.acps.k12.va.us 15
Design Evolution 1. Adjusted materials based on palette feedback 2. Changed connection between classroom wings – structure and material 3. Addition of awning for operational use/solar coverage www.acps.k12.va.us 16
Design Update • Massing/ Canopy • Fenestration www.acps.k12.va.us www.acps.k12.va.us 17
Design Update • Massing/ Canopy • Fenestration www.acps.k12.va.us www.acps.k12.va.us 18
Next Steps • Staff and design team working through finalizing details and costs over the summer • Any major updates will be communicated to the Advisory Group via e-mail and on the website • Advisory Group Meeting in late August, prior to public hearing with Planning Commission and City Council Superintendent School Board Meagan L. Alderton Michelle Rief Dr. Gregory C. Hutchings, Jr. Cindy Anderson, Chair Ramee A. Gentry Christopher A. Suarez Veronica Nolan, Vice Chair Jacinta Greene Heather Thornton www.acps.k12.va.us 19 Margaret Lorber