DOC Submission to PAPP Reassessment
Legal context Pest control Performance stds Environment, Public & DOC project plan worker safety MOH Public health RMA Discharge of contaminants ACVM Food safety, trade & animal welfare EPA Environmental & Public safety 2
Support: Deletion of control requiring notification to 3km • Methods of release: “ bait station design must be appropriate to target pest, while excluding non- target species…examples that meet these requirements are DOC 200 bait stations…and stoat tunnels” 3
4
Support: Deletion of control requiring notification to 3km • Public health permission and DOC permission required before PAPP can be used • Planned notifications are assessed • Additional pre-operational notifications can be imposed as conditions 5
Oppose: Proposed control for stoat-specific bait station • New control is not needed as existing control requires cats to be excluded • DOC evaluates the proposed bait station design in the permission process 6
Oppose: Proposed control for stoat-specific bait station • DOC opposes the prescription of a specific design – Some sites have few non-targets and no domestic cats – Future design changes would require reassessment – No non-target or efficacy data for new design 7
Propose: Amend ‘Method of release’ control Method of release: Bait stations only. The bait station design must be appropriate to the target pest, while excluding non-target species and minimising access by unauthorised persons. When targeting stoats, examples that meet these requirements are DOC 200 trap boxes or tracking tunnels. When targeting feral cats, the wooden submarine bait station is an example that meets these requirements. 8
Propose: Amend ‘Notification of operations’ control • Use the same notification control as applies to micro-encapsulated zinc phosphide paste and bait containing sodium nitrite • Includes Medical Officer of Health, veterinarians, adjacent land occupiers and owners, and in some cases police 9
Comments on E&R Report • Propose new control overlaps with the existing method of release control • Users will not access an appendix to the decision for guidance on designs 10
Thank you
Recommend
More recommend