demand connection code update
play

Demand Connection Code - Update Place your chosen image here. The - PowerPoint PPT Presentation

Demand Connection Code - Update Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Dwayne Shann JESG 13 June 2012 Agenda


  1. Demand Connection Code - Update Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Dwayne Shann JESG – 13 June 2012

  2. Agenda � Call for Evidence - Responses � Upcoming Consultation � Upcoming Stakeholder Engagement � AOB 2

  3. Responses High Level Overview General Need DSR DSR SFC Reactive Voltage Frequency Power Exchange 3

  4. Speaker Notes � This is the high-level summary of the Call for Evidence Responses produced by ENTOS-E � The analysis is divided across the individual areas outlined in the Call for Evidence � Further detail will be provided in the consultation pack of the Formal Consultation. 4

  5. Call for Evidence – Responses Breakdown � 21 organisations (7 UK) provided feedback: � Energy suppliers, DSOs, industry customers, DSR providers & manufactures of domestic appliances. � UK organisations / companies: � ENW, SPD, UKPN, WPD, EDF Energy, Renewable UK & SSE Generation. � Assessment of content: � Mixed responses from full support to out-right rejection. � No alternative CBAs provided or significant alternative data. 5

  6. Key Activities � ENTSO-E is now finalising the code prior to issue for Formal Consultation: � Consultation scheduled to run from 30 June – 3 September � Papers can be downloaded and responses to consultation via the ENTSO-E website: � https://www.entsoe.eu/resources/consultations/ � JESG Technical Secretary will circulate further links 6

  7. Consultation Pack � The Consultation Pack will include: � Draft Demand Connection Network Code � Explanatory note, covering: � Evaluation of feedback on stage 1 � Spreadsheet – full raw feedback � Further Cost Benefit Analyses � Frequently Asked Questions 7

  8. Stakeholder Engagement � ENTSO-E workshop � 8 August, Brussels � JESG DCC Workshops These dates are subject � 16 July – 10:30 – 17:00 to Review; please consult � 17 July – 09:00 – 12:00 JESG Calendar on website � The Saxon Mill, Warwick � What would GB Stakeholders like to be presented at the July Workshop? 8