community consultation session
play

Community Consultation Session 12 December 2017 Tonights Agenda - PowerPoint PPT Presentation

EDGARS CREEK BRIDGE Community Consultation Session 12 December 2017 Tonights Agenda Outline design options under investigation Feasibility study progress including; Melb Water requirements, cultural heritage, flora/fauna, DDA


  1. EDGARS CREEK BRIDGE Community Consultation Session 12 December 2017

  2. Tonight’s Agenda • Outline design options under investigation • Feasibility study progress including; Melb Water requirements, cultural heritage, flora/fauna, DDA requirements, structural form, materials, aesthetics • Design Considerations • Open discussion

  3. Community Consultation Session Feasibility Study for Improved Edgars Creek Pedestrian Bridge transport | community | mining | industrial | food & beverage | carbon & energy Presentation Team Chris Morton – Senior Bridge Engineer Date: 12 December 2017 Time: 7PM – 9PM Location: Newlands Senior Citizens Centre pitt&sherry - Proud winner of “Best Consulting Engineering Firm Revenue 49-53 Murray Road, Coburg (Cnr Connolly Avenue) under $50M”

  4. Location

  5. Original Bridge

  6. Flood Damage

  7. Existing Condition

  8. Option 1 – Replace Bridge

  9. Flood Immunity Original bridge deck level

  10. Flood Immunity 1 in 10 year ARI flood level = 44.8m AHD Original bridge deck level

  11. Flood Immunity New bridge deck level approx. 45.5m AHD New steel beams Approach spans Original bridge deck level

  12. 10 Year ARI Contours

  13. Alignment Options

  14. Steel Beam Span

  15. Steel Truss Span

  16. Option 2 - Boardwalk

  17. Existing Track

  18. Existing Track

  19. Existing Track

  20. Existing Track

  21. Existing Track

  22. Steel / Concrete Boardwalk

  23. Timber Boardwalk

  24. Geometry • 3m clear width on structure • Height depends on flood level • Length depends on alignment

  25. Design Standards • AS5100 (2017) Bridge Design – 100 year design life – 5kPa (500kg/m 2 ) pedestrian design loading – 1.4m barrier height for cyclists – Forces due to water flow

  26. Design Standards • AS1428.1 (2009) Design for Access and Mobility – 1 in 14 maximum ramp gradient – Ramps to be provided with handrails • AS2156 (2001) Walking Tracks – Track classification – Design loads and barrier requirements – Design life 8 to 25+ years

  27. Materials • Steel (galvanised or paint coating) • Reinforced concrete • Timber (treated pine or hardwood) • Fibre reinforced polymer (FRP) • Recycled plastic

  28. Materials • Durability • Maintenance • Aesthetics • Slip resistance • Cost

  29. Land Ownership

  30. Site Geology

  31. Rock Formation

  32. Land Slip

  33. Native Vegetation Destruction, lopping or removal of native vegetation requires a planning permit. Where native vegetation is permitted to be removed a native vegetation offset is required.

  34. Cultural Heritage 7822-0851 This artefact scatter consists of a single reddish coarse grained silcrete broken flake. 7822-0852 This artefact scatter consists of a single small fine grained grey silcrete flake.

  35. Services

  36. Thank you!

  37. Conclusion • Closing by council – Next Steps – Completion of Feasibility Study – Report to Council • Community input can be forwarded onto Pitt & Sherry at cmorton@pittsh.com.au or Attn: Chris Morton Pitt & Sherry PO Box 259 South Melbourne VIC 3205

Recommend


More recommend