Citizens Advisory Committee Histor His oric ic and and Cult ultur ural al Res esour ources ces Shaw Shawn Sno n Snow His istor oric and C ic and Cult ultur ural R al Res esour ources ces M Mana anager ger Thur hursday day, , May 31, ay 31, 201 2018
Historic Buildings Strategy/ Mead & Hunt Summary Report Five Treatme tments ts for r Histo tori ric Resources at t NWC: (in Phase 1 and 2 areas as well as “The Triangle”) 1. 1. Rehabilit ehabilitation ion – incorporate rehabilitation of the structure into the site plan, if deemed feasible 2. 2. Relo eloca cation ion - Document and identify the feasibility of relocation or reuse of the resource at a new location on the site 3. 3. Salv alvage ge - Document, reuse salvageable materials and demolish 4. 4. Futur Fut ure I e Int nter erpr pret etation ion - Document, interpret, and demolish the resource 5. 5. Standar andard d Demolit emolition ion - Document and demolish the resource Internal Draft Work Product. Not for Distribution
1 . Rehabilitation — incorporate rehabilitation of the structure into the site plan, if deemed feasible SIX S STRUC UCTUR URES CUR URRENT NTLY UND UNDER REVIEW W FOR FOR REHA HABILI LITATION ON Internal Draft Work Product. Not for Distribution
Former Armour Office Building, 5001 Packing House Road • Built 1917 • National Register-Eligible: Criterion A (Agriculture, Economic Development, Social History, and Transportation) and Criterion C (Architecture) • Denver Landmark Status and Criteria: 1 (History), 2 (Architecture). Draft landmark nomination has been prepared. Livestock Exchange Buildings 4701 Marion Street • Built 1898, 1916, 1919 • National Register-Eligible: Criterion A (Association with Denver Union Stock Yards and NWSS) and Criterion C (Architecture) • Denver Landmark Status and Criteria: 1 (History), 2 (Architecture)
McConnell Welders 4747 Packing House Road • Built 1930 • National Register-Eligible: Criterion A (Association with Denver Union Stock Yards and NWSS) and Criterion C (Architecture) • Denver Landmark Status and Criteria: 1 (History), 2 (Architecture) • Contributing to the Denver Union Stock Yards Historic District Artist Studio (Neorama/Blue Silo) 4701 Packing House Road • Built 1918 • National Register-Eligible: Criterion A (Social History and Ethnic Heritage) and Criterion C (Architecture) • Denver Landmark Status and Criteria: 1 (History), 2 (Architecture) Internal Draft Work Product. Not for Distribution • Contributing to Denver Union Stock Yards Historic District
Animal/Sheep Bridge, Behind 4877 Packing House Road • Built 1922, 1929, c.1951 • National Register-Eligible: Criterion A (Economic Development and Social History) and Criterion C (Architecture) • Denver Landmark Status and Criteria: 1 (History), 2 (Architecture) King Energy, Inc./“Hay Barn #3” 5012 Packing House Road • Built 1929, 1969 • National Register-Eligible: Criterion A (Association with Denver Union Stock Yards and NWSS, ) and Criterion C (Architecture) • Denver Landmark Status and Criteria: 1 (History), 2 (Architecture) • Contributing to Denver Union Stock Yards Historic District Internal Draft Work Product. Not for Distribution
2. Relocation - Document and identify the feasibility of relocation or reuse of the resource at a new location on the site TEN ST N STRUC UCTUR URES CUR URRENT NTLY UNDER UNDER REVIEW W FOR FOR RELOC OCATION ON Internal Draft Work Product. Not for Distribution
Brands Building, 5000 Packing House Road • Built 1929, 1969 • National Register-Eligible: Criterion A (Agriculture) • Denver Landmark Status and Criteria: 1 (History) Stock Car, approx. 4755 Packing House Road • Built 1904 • National Register-Eligible: Criterion A (Association with Denver Union Stock Yards, NWSS, Economic Development, Social History and Railroad Transportation) • Denver Landmark Status and Criteria: 1 (History) Internal Draft Work Product. Not for Distribution
Chute Office 5000-5010 Packing House Road • Built c.1920 • Contributing to the Denver Union Stock Yards Historic District • Scale inside of building Office/Scale No. 6 5000-5010 Packing House Road • Built c.1920 • Contributing to the Denver Union Stock Yards Historic District Internal Draft Work Product. Not for Distribution
Bison/Yards Chutes 5000-5010 Packing House Road • c . 1970 • Assess the viability of reusing these bison chutes and/or seek consideration from WSSA Yards Scale 5000-5010 Packing House Road • Assess the viability of reusing these bison chutes and/or seek consideration from WSSA Internal Draft Work Product. Not for Distribution
Loafing Shed 5000-5010 Packing House Road • Built c.1975 • Contributing to the Denver Union Stock Yards Historic District Guard Shack 5000-5010 Packing House Road • Built c.1925 • Contributing to the Denver Union Stock Yards Historic District Internal Draft Work Product. Not for Distribution
Armour Water Tower 5011 Packing House Road • Built 1917 • National Register-Eligible: Criterion A (Agriculture, Economic Development, Social History, and Transportation) • Denver Landmark Status and Criteria: 1 (History) The Pens 5000-5010 Packing House Road • Built 1886 • Save one or two historic pens for interpretation and place making on the new campus. Another option is to save a concentration of Internal Draft Work Product. Not for Distribution pens that are in the best condition.
3. Salvage - Document, reuse salvageable materials and demolish The P he Pens ens ( (par partial) ial) – 5000 5000-5010 P 5010 Pac acking king Hous ouse R e Road oad • Yar ards ds Fea eatur ures es – in T in The P he Pens ens • Ele levated ed Walk alkway/ ay/Catwalk alks/Met etal al Stair airs/Sign ignage ge • Liv Livest estoc ock C k Cent enter er-Auct uction ion Arena ena - 4701 M 4701 Mar arion S ion Street eet • Ser ervice ice S System ems, , Inc. nc. ( (KM C Conc oncess ession ions)/NWS WSS C Cof offee ee House ouse – 4699 4699 • Mar arion S ion Street eet Den enver er U Union S nion Stoc ock k Yar ards ds ( (DUSY) Joint oint T Trac ack k No. 2/ . 2/Den enver er R Roc ock k • Islan land R d Railr ailroad oad – par paralle allel l to o Pac ackin king H g House R ouse Road oad DUSY Co. J . Join oint T Trac ack k No. 20 . 20/Den enver er R Roc ock k Islan land d Railr ailroad oad – par paralle allel l • to S o Sout outh h Pla latte e Riv iver er Internal Draft Work Product. Not for Distribution
The Pens 5000-5010 Packing House Road ▪ Built 1886 ▪ Contributing to the Denver Union Stock Yards Historic District ▪ Inventory and develop a plan for both metal and wooden fences and gates that make up The Pens, including older pens found in Calf Alley. Determine which gates and fences are salvageable for reuse, and which will be made available to NWSS for fundraising or other campus place making efforts.
Yards Features 5000-5010 Packing House Road ▪ Such objects include painted stall numbers; water pumps; concrete stem walls and concrete posts; metal gussets, hinges and latches; concrete and brick walkways; metal and concrete water troughs; loading docks and manhole covers. Such objects may prove useful for future artists and place makers on the new campus. ▪ Other campus artifacts are also being surveyed and saved for potential use in place making, including signs and posts; metal stairs and arrowhead cutouts; scales; tumbled pavers; utility poles and railroad-related hardware (if possible).
4. Future Interpretation - Document, interpret, and demolish the resource Packing House Road/N /National Western Dri Drive – (north th • th Avenue to Ra of 46 th Race Co Court) Le Le Mouton – 4877 Packing House Road • Le Mouton/B /Bio En Energy Bu Building (double barrel roof • warehouse) – 4875 Packing House Road De Delgany Interceptor – east Si Side of So South Pl Platte Ri River • Internal Draft Work Product. Not for Distribution
5. Standard Demolition - Document and demolish the resource Co Concrete Bl Block Sh Shed • Pepsi Ar Arena/St /Stockyards Ar Arena – 5010 Packing House • Road/i /in The Pens Internal Draft Work Product. Not for Distribution
General Strategy for Historic and Cultural Resources from Any Demolished Building • Retain any elements that help tell the story of the changing campus ’ past built environment • Architectural remnants or building artifacts may inspire future artists, planners and place makers. Internal Draft Work Product. Not for Distribution
General Strategy for Historic and Cultural Resources for Future Phases of the Redevelopment • Remaining Baldwin Court buildings under consideration for incorporation into the campus. • Connect the history and legacy of both sides of Brighton Boulevard. • The Campus Placemaking team will evaluate reuse possibilities as part of the future phases of redevelopment. Internal Draft Work Product. Not for Distribution
Recommend
More recommend