cambridge south east
play

Cambridge South East Transport Study LLF 6 June 2018 Project - PowerPoint PPT Presentation

Cambridge South East Transport Study LLF 6 June 2018 Project Update Public Consultation Completed Assembly 14 June 2018 Executive Board 4 July 2018 Public Consultation Feedback 9 February to 9 April 2018 22,000


  1. Cambridge South East Transport Study LLF 6 June 2018

  2. Project Update • Public Consultation Completed • Assembly – 14 June 2018 • Executive Board – 4 July 2018

  3. Public Consultation Feedback • 9 February to 9 April 2018 • 22,000 leaflets • 13 Events • 1785 survey responses received

  4. Respondent Interest in Project 2.60% 3.93% Cambridge 23.41% Work in the Area 38.67% 6.42% South Cambs 64.10% Travel in the Area Regularly 55.72% 10.00% 5.55% Resident in Cambridge Resident in South Cambridgeshire Resident elsewhere Local business owner/employer Regularly travel in the area Occasionally travel in the area Work in the area Study in the area Other Respondents could select more than 1

  5. Respondent Transport Mode 0.23% 5.10% Foot 29.88% Car Driver 84.31% Bus 36.65% 2.08% Cycle Car Passenger 39.66% 2.14% 22.24% Car driver Car passenger Van or lorry driver Bicycle Powered two wheeler Bus user On foot Other Not applicable Respondents could select more than 1 mode

  6. Respondent Workplace CBC 22.35% Other 34.19% Granta Park 11.23% Linton Babraham Research 4.02% 6.69% Haverhill 4.22% Cambridge City 27.19% Cambridge Biomedical Campus (including Addenbrooke's Hospital) Granta Park Babraham Research Campus Cambridge city centre Haverhill Linton Other

  7. Respondent Location East of Linton 20% Between A11 and Linton 39% West of A11 42%

  8. Phase 1 Support Speed reduction measures - Horseheath to Linton Dean Road crossroads - close central reserve Bartlow Road roundabout and rural hub Westbound bus lanes on approach to B1052 Measures to ease bus movements in Linton Signalisation and right-turn ban (except buses) from Linton… Linton Village College junction signal upgrade Peak-hour eastbound bus lanes on approach to Linton Village… Signalise Hildersham crossroads with Toucan/Pegasus crossing Multi-user crossing of A11 via improved footbridge & underpass Eastbound bus lane at A11 Signalised crossing at the Babraham Research Campus… Multi-user underpass at Wandlebury Haverhill Road and the Gog Farm Shop junction safety… Linton Greenway Extra cycle storage at Babraham Road P&R Granham's Road junction - right-turn lane 0 200 400 600 800 1000 1200 1400 1600 1800 SUPPORT STRONGLY SUPPORT NO OPINION STRONGLY OPPOSE OPPOSE

  9. Phase 1 Support Speed reduction measures - Horseheath to Linton Dean Road crossroads - close central reserve Bartlow Road roundabout and rural hub Westbound bus lanes on approach to B1052 Measures to ease bus movements in Linton Signalisation and right-turn ban from Linton High Street Linton Village College signal upgrade Peak-hour eastbound bus lanes on approach to Linton Signalise Hildersham crossroads Multi-user crossing of A11 Eastbound bus lane at A11 Signalised crossing at Babraham Research Campus Multi-user underpass at Wandlebury Haverhill Road and the Gog Farm Shop junction Linton Greenway Extra cycle storage at Babraham Road P&R Granham's Road junction improvement 0% 20% 40% 60% 80% 100% 120% Supporting Opposing No Opinion

  10. Phase 2 Support Strategy 1 OPPOSE Strategy 2 STRONGLY OPPOSE Strategy 3 NO OPINION STRONGLY SUPPORT SUPPORT 0 200 400 600 800 1000 1200 1400 1600

  11. Phase 2 Support SUPPORT STRONGLY SUPPORT STRONGLY OPPOSE OPPOSE 140 237 254 236 174 205 298 710 321 570 513 354 STRATEGY 1 STRATEGY 2 STRATEGY 3

  12. Strategy 1 – Support by Location

  13. Strategy 2 – Support by Location

  14. Strategy 3 – Support by Location

  15. Phase 1 Changes • Reconsider RT ban – Linton High Street • Reconsider Dean Road closure • Reconsider speed reduction Linton to Horseheath • Consider other comments in development

  16. Phase 1 • GCP Board July 2018 • Note Results of Public Consultation • Proceed with Implementation of Phase 1

  17. Phase 2 Take to GCP Board September/October 2018

  18. Tranche 1 – 2018/19 Linton Village College junction signal upgrade Extra cycle storage at Babraham Road Park & Ride Peak-hour eastbound bus lanes on approach to Linton

  19. Tranche 2 – 2019/20 Measures to ease bus movements in Linton Linton High Street junction signalisation Eastbound bus lane at A11 Signalised multi-user crossing – Babraham Research Granham’s Road junction improvement Horseheath to Linton safety improvements Westbound bus lanes on approach to B1052 junction Signalise Hildersham crossroads with Toucan/ Pegasus Dean Road safety improvements

  20. Tranche 3 – 2020/21 Linton Greenway Bartlow Road roundabout & rural hub Haverhill Road and the Gog Farm shop junction Wandlebury multi-user underpass Multi-user crossing of A11 via improved footbridge