Beyond Compliance: Sustainability and Green Remediation on NYC Brownfield Sites NYC OFFICE OF ENVIRONMENTAL REMEDIATION
OER and the VCP Program
Sustainability and Climate Change Resilience Survey Flood zone awareness Sustainable materials management In-situ remediation Efficient site management Green building opportunities
Remediation Sites in the Flood Zone
Flood Zone Awareness
Materials Management Clean Soil Bank Asphalt Millings Bank Woodchips Topsoil Compost Concrete aggregate
NYC Clean Soil Bank
11-Point Vetting of Soil Quality •Phase 1 site history •Rigorous soil chemistry testing, qualifying Soil meets: •Residential SCOs NYSDEC Part 375-6.8 Soil Vetting by •native soil Generator •Identify recipient match • Environmental professional monitors soil excavation: • Each truck certified as “clean native soil” Soil Vetting • Transport manifest executed for each truckload during Transfer • EP inspects soil on receipt • Transport manifest signed and reported Soil Vetting by Recipient
Cost Savings Cost Total Quantity Cost Savings Savings Cost (Tons) (Generator) (Recipient) Savings 370,000 $10.24 M $17.56 M $27.8 M
Environmental Benefits Metric Tons Quantity Truck Miles Gallons of of CO 2 (Tons) Eliminated Fuel Saved Equivalent 300,000 701,800 175,750 1,750
Asphalt Millings Bank Cost savings Reduces truck miles Uses on remedial sites
In-Situ Remediation Bioremediation Soil vapor extraction Eliminates soil disposal and trucking
Effective Site Management Sediment erosion controls Reducing truck idling VCP Sustainability Statements
Green Building Opportunities Passive cooling and shading designs Water retention Green roofs Grant opportunities
Thank you! Kate Glass kglass@dep.nyc.gov