Ann Arbor Station Environmental Review PUBLIC MEETING
AGENDA 1. Purpose of the Meeting 2. Project Update 3. Alternatives Analysis Phase I 4. Alternatives Analysis Phase II 5. Next Steps 6. Questions 7. Public Comment
PURPOSE OF THE MEETING - Present DRAFT findings - Receive comments - Complete questionnaire
PROJECT UPDATE
EXISTING STATION
PROJECT ACTIVITY SINCE MAY 2015 – Coordination with MDOT and FRA – Project Alignment with Corridor-wide Tier I EIS – Reduced parking requirement – Reduced station size – FRA Project Manager change
PROJECT UPDATE
ALTERNATIVES ANALYSIS Phase 1
PHASE I ALTERNATIVES
ALTERNATIVES ANALYSIS Phase I ALTERNATIVES ELIMINATED: 1, 2, 6, 7, 8
ALTERNATIVES ANALYSIS Phase I ALTERNATIVES CARRIED FORWARD: 3, 4, 5
ALTERNATIVES ANALYSIS Phase II
Screening Criteria – Location Within the Community – Accessibility – Site Assessment
Site Assessment – Environmental Factors – Floodplain – Hazardous Materials – Cultural/Historic Resources – Recreational Lands – Property Ownership
ALTERNATIVES ANALYSIS Phase II ALTERNATIVES ELIMINATED North Main, 3B, 3C, 3D
ALTERNATIVES ANALYSIS Phase II ALTERNATIVES CARRIED FORWARD
ALTERNATIVES ANALYSIS Phase II ALTERNATIVE 2A
ALTERNATIVE 2A
ALTERNATIVE 2A – Elevated station at Depot Street – New Traffic Signal – Buses on Broadway and Depot – DTE Property
ALTERNATIVES ANALYSIS Phase II ALTERNATIVE 2B
ALTERNATIVE 2B
ALTERNATIVE 2B – Ground station at Depot Street – New Traffic Signal – Buses on Broadway and Depot – DTE Property
ALTERNATIVES ANALYSIS Phase II ALTERNATIVE 2C
ALTERNATIVE 2C
ALTERNATIVE 2C – Re-use of the Michigan Central Station – New Traffic Signal – Buses on Broadway and Depot – DTE Property – Michigan Central Depot
Alternatives Analysis Phase II Alternative 3A
ALTERNATIVE 3A
ALTERNATIVE 3A – West Fuller – Elevated Station – Buses on first level of parking structure – Park Property
MEETING QUESTIONNAIRE/Survey We’ve developed a written and an online version of a survey related to the Alternatives Analysis
NEXT STEPS
NEXT STEPS - TIMELINE
NEXT STEPS - TIMELINE – Public comments - Phase II Alternatives Analysis finalized – Remaining alternatives reviewed under NEPA Regulations through EA process – EA process includes No-Build and Remaining Alternatives – Impacts documented and Preferred/Recommended Alternative identified in EA document – The EA document approved/signed for Public Review by FRA and MDOT – A 30-day review period – A public hearing held during the 30-day review period – Comments received and addressed – If no significant impacts are associated with the Preferred/Recommended Alternative, FRA prepares the Finding of No Significant Impacts (FONSI) document.
THANK YOU Eli Cooper, AICP Robert Gorski, PE Transportation Program Project Manager Manager AECOM City of Ann Arbor robert.gorski@aecom.com ecooper@a2gov.org 313-961-3418 734-794-6430 x.43710 www.a2gov.org/annarborstation