2002 2013 First Acquired Orient Jenbacher Energy Bangaldesh, sales into Agaricus & GE Africa 2008 Southern Africa Service 1989 Tunisia 1995 Established in Jenbacher the UK as engine distributor service company 2011 UK 2003 2015 Algeria Acquired Cogen Cameroon India 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 2012 1991 2004 Distributor ISO 1998 for Acquired accreditation Tanzania Jenbacher Australia, France New Zealand, Nigeria 2014 2003 Queen’s Award for Enterprise – GE International acquires Trade Jenbacher 2005 Ireland
Jim Clarke Chairman Jamie Clarke Peter Holiday CEO CFO Alan Fletcher, Haydn Rees Didier Lartigue Anand Bhishikar Greg Columbus Main Board UK, Ireland & France & South Asia Australasia Director & Sales Anglophone Francophone Lead Africa Africa s.S. S.A. . = sub ub-Sa Sahara aran Afric ican n territ itorie ies
2.1 1.6 1.3 0.0 UK Australia 5.4 France 6.4 34.0 Nigeria India 19.5 Bangladesh Ireland South Africa 29.6 Tanzania
Customer project Product quality focused focused Installation design Engine design Project management Engine development Installation works Engine manufacture Commissioning Parts production Maintenance Parts stockholding
0.1 – 5.0 MW 5 – 25 MW Gas Produ oducts Power er Gener nerat ation ion TYPE 3 TYPE 2 Type 4 Type 6 Type 9 500 kW – 1 MW 250 kW – 330 kW 800 kW – 1.5 MW 1.5 MW – 4.4 MW 9.5 MW Mechanic anical Driv ives es VGF* VHP* 275GL+* 120 kW – 880 kW 315 kW – 1.5 MW 1.9 MW – 3.6 MW Dies esel el Produc oducts 250 228 616 1.5 – 3.2 MW 2.6 MW 1.5 – 4.5MW
Industry Biogas Oil and gas Food waste digestion • Energy efficient captive Food waste digestion • • Landfill sites • power plants Landfill sites • Sewage works • Cogeneration Sewage works • • Trigeneration • Island mode operation •
St Thomas’ Hospital London, England, Natural gas fuelled CHP (electricity, hot water and steam), 1 x JMS620, 3MW e , Saving £1m fuel costs and 5,500t CO 2 per year
Thank you for your attention +44 (0)151 546 4446 www.clarke-energy.com
Recommend
More recommend