2003 Greater Vancouver Regional Travel Time Survey Clark Lim, - PowerPoint PPT Presentation

URISA BC Seminar GIS in Planning and Transportation December 13, 2004 2003 Greater Vancouver Regional Travel Time Survey Clark Lim, P.Eng. Senior Transportation Engineer Greater Vancouver Transportation Authority Transportation Research


  1. URISA BC Seminar GIS in Planning and Transportation December 13, 2004 2003 Greater Vancouver Regional Travel Time Survey Clark Lim, P.Eng. Senior Transportation Engineer Greater Vancouver Transportation Authority Transportation Research & Technical Services Dept. Planning Division

  2. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey EMME/2 • Traffic Demand Assignment Modelling Environment • “Greater Vancouver Transportation Model” • Traffic Zone System – pop. & emp. • Transportation Network – road & transit • A Set of Equations and Rules describing travel choice and behaviour 2 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 URISA BC GIS in Planning & Transportation, Dec. 13, 2004

  3. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey GVRD Traffic Zone System 3 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 GIS in Planning & Transportation, Dec. 13, 2004

  4. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey 4 Step Method 2. Trip Distribution 2. Trip Distribution 1. Trip Generation 1. Trip Generation i i T ij j T j i i j j ij 4. Trip Assignment 4. Trip Assignment 3. Mode Split 3. Mode Split Route taken by T ij auto i i T ii ii Transit Transit i i j j T ii ii Auto Auto T ii ii Walk/Bike Walk/Bike j j 4 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 URISA BC GIS in Planning & Transportation, Dec. 13, 2004

  5. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey Volume Delay Function – road capacity 9.0000 8.0000 7.0000 Posted S peed=50 kph Link Length = 1 6.0000 Posted S peed=60 kph kilometre 5.0000 Posted S peed=70 kph Posted S peed=80 kph 4.0000 3.0000 2.0000 1.0000 0.0000 1 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 5 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 URISA BC GIS in Planning & Transportation, Dec. 13, 2004

  6. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey Logit Functions – mode choice 1.20 Work Post-secondary 1.00 Grade S chool Leisure/ Family 0.80 0.60 0.40 Auto Impedance=50 0.20 0.00 0 10 20 30 40 50 60 70 80 90 100 Transit Impedance (min.) 6 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 URISA BC GIS in Planning & Transportation, Dec. 13, 2004

  7. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey Auto Assignment 7 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 GIS in Planning & Transportation, Dec. 13, 2004

  8. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey Automobile CO2 Emissions by 5km Grid (AM Peak hour) 8 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 GIS in Planning & Transportation, Dec. 13, 2004

  9. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey Purpose of Travel Time Survey Monitoring • develop a regional congestion indicator for Corporate Scorecard and Regional Transportation Monitoring Program • develop matrices indicating travel times / avg. speed between regional activity centres for AM / PM / weekend peak periods Planning • calibrate the regional travel demand model’s (EMME/2) link speeds • develop a data repository of road travel performance of major corridors and infrastructure 9 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 URISA BC GIS in Planning & Transportation, Dec. 13, 2004

  10. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey Project Members • Ryan So Sr. Transportation Planner • Ken Tseng, P.Eng. Project Coordinator • Dave Murray Transportation Planning Analyst • Glen So Applications Developer 10 10 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 URISA BC GIS in Planning & Transportation, Dec. 13, 2004

  11. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey A Survey Design 11 11 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 GIS in Planning & Transportation, Dec. 13, 2004

  12. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey Project Scope • Main Survey – Greater Vancouver Region – 3.5 month survey period (Sept-Dec 2003) – 4 time periods (AM, Mid-Day, PM, Sat. Mid.) – 20 drivers – 14 regional “activity centres” – 1 second GPS data capture • 2 nd “Sub-survey” – City of Vancouver – 2 drivers, 18 “activity centres” 12 12 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 URISA BC GIS in Planning & Transportation, Dec. 13, 2004

  13. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey Survey Time Periods • AM Peak Period: 7 AM – 9 AM • Mid Day Period: 11 AM – 1 PM • PM Peak Period: 3 PM – 6 PM • Weekend Peak Period: 12 PM – 2 PM (Saturday) 13 13 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 URISA BC GIS in Planning & Transportation, Dec. 13, 2004

  14. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey Main Survey Activity Centres & Routes 14 14 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 GIS in Planning & Transportation, Dec. 13, 2004

  15. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey Vancouver Sub-Survey Activity Centres & Routes 15 15 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 GIS in Planning & Transportation, Dec. 13, 2004

  16. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey Example Routing 16 16 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 GIS in Planning & Transportation, Dec. 13, 2004

  17. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey Survey Design & Apparatus • “Floating car” method • Trips from/to activity centre – mimic “actual trips” • Use of electronic equipment – minimal interaction 17 17 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 URISA BC GIS in Planning & Transportation, Dec. 13, 2004

  18. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey GPS Equipment Setup 18 18 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 GIS in Planning & Transportation, Dec. 13, 2004

  19. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey GPS Equipment – Logger Events Button 19 19 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 GIS in Planning & Transportation, Dec. 13, 2004

  20. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey GPS Equipment – In Vehicle 20 20 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 GIS in Planning & Transportation, Dec. 13, 2004

  21. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey Software Tools • MapInfo – data analysis & automation • ArcGIS – route development • MS FoxPro – data management & analysis • MS Access – route development • EMME/2 – initial travel time est. • FME – data extraction & conversion • GeoKinetics Engine – data editing & manipulation • OpenSource – SVG (XML) 21 21 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 URISA BC GIS in Planning & Transportation, Dec. 13, 2004

  22. 2003 Greater Vancouver Regional 2003 Greater Vancouver Regional Travel Time Survey Travel Time Survey GIS Data • Digital Road Atlas (GIS Innovations) • Orthophotos (McElhanney Consulting Services) • Greater Vancouver EMME/2 network • GVRD municipal boundary 22 22 Clark Lim, P.Eng. Clark Lim, P.Eng. URISA BC URISA BC – GIS in Planning & Transportation, Dec. 13, 2004 GIS in Planning & Transportation, Dec. 13, 2004