Average rainfall each day, mm 6.8 Singapore 4.7 New Zealand 3.3 UK 1.5 Australia 0.2 UAE
3.6 Other parapets Generally stone coped flint walled upstands externally All elevations that are then brick lined internally. Lead flashings are dressed down over upstands at abutments. Finials on gable ends. Condition A small section of coping stone is missing on the north parapet wall of the Nave (see photo). The pointing is poor to the exposed courses of internal brickwork on the east gable upstand (see photo). A plant is starting to grow on the east gable wall south side in the corner (see photo). Repairs needed The damaged coping in the parapet wall to north side of 3 Nave needs to be repaired. The inner facing brickwork joints to the east gable 3 upstand wall need to be repointed. The plant growing in the SE corner should be removed. 1
Category 1: of utmost urgency Category 2: essential within the next 12 months Category 3: required during the next 5 years (allowing time to develop a strategy and fund raise) Category 4: within the next 10 years or nice to do if possible Category 5: works to improve disability access and to comply with the DDA Category 6: items of routine maintenance Category 7: items requiring further investigation or specialist advice Category 8: items to be regularly monitored
Recommend
More recommend